How long does installation take?
It depends on the modules and the building work. Fencing, foundations and services usually take longer than the mechanical assembly, so Herochu plans them as separate phases with separate owners.
Can the system be extended later?
If the first phase leaves space and interface capacity for it. A standalone loader can usually be connected to storage later, provided the layout reserved the transfer path and the controls support it.
Does a storage tower replace a forklift?
It reduces forklift work at the machine but does not remove deliveries. Pallets still arrive, and someone still loads them at the transfer station.
Is a storage tower worth it for a single laser?
It is when a wide material mix makes searching and changing stacks interrupt cutting, or when floor space around the machine is scarce. For one grade run continuously, Herochu would quote a standalone loader instead.
Can a tower store remnants and offcuts?
Yes, if remnant cassettes are in scope. Without a remnant routine, offcuts accumulate on the floor and the storage gain disappears.
What is the difference between a storage tower and an ASRS?
The terms overlap. A tower is one physical form; an automated storage and retrieval system describes the mechanism and controls that address positions and deliver material, whether the structure is a tower, a rack or a multi-level layout.

Does a sorting unit remove the skeleton as well as the parts?
It can, if skeleton handling is in scope. Many cells pick parts first and then discharge the skeleton to a separate container, so ask for both functions to be quoted separately.
Can sorting be added to a laser that already has automatic loading?
Often yes, provided the unloading position can present the cut sheet and the controller can pass nest data. The usual constraint is space and the height available for the gantry.
Is sorting worth it for low-volume, high-mix work?
Only where part families repeat enough to justify programming pick positions. Otherwise a buffer and a well-lit clearing station deliver most of the benefit for far less. Herochu quotes the sorter as a separate module so the choice stays open.
Can automatic loading be added to an existing fiber laser?
Usually, if the controller exposes a loading interface and there is space for the loader envelope and fencing. Check table height and datums, the handshake protocol, and whether the foundation carries the added load.
Does the loader handle different thicknesses in one stack?
Only where separation is reliable. Magnetic or pneumatic separation and double-sheet detection help; heavily oiled or bowed sheets belong in single-grade stacks.
Does unloading remove the skeleton as well?
Not by default. Skeleton removal and part separation are separate functions. Ask for loading, unloading, retrieval, return and sorting to be quoted separately.