Gantry Automated Storage and Retrieval System for a High-Density Steel Warehouse
A gantry automated storage and retrieval system keeps long goods in multi-level rack towers and serves every shelf from one rail-mounted gantry. The shelves stand on floor rails and share a single picking aisle, so a bay that would hold five forklift aisles can carry the storage positions of ten rack rows instead.Most steel warehouses lose more floor to circulation than to storage. A 6 m pipe needs a forklift with a 3.5 to 4 m turning aisle, and every second rack row adds another one. The gantry layout attacks that ratio directly: the truck never enters the storage area. What follows is how the machine works, where the density comes from, and which Herochu model fits a given pipe length and load.
Gantry Automated Storage and Retrieval System for a High-Density Steel Warehouse
A gantry automated storage and retrieval system keeps long goods in multi-level rack towers and serves every shelf from one rail-mounted gantry. The shelves stand on floor rails and share a single picking aisle, so a bay that would hold five forklift aisles can carry the storage positions of ten rack rows instead.
Most steel warehouses lose more floor to circulation than to storage. A 6 m pipe needs a forklift with a 3.5 to 4 m turning aisle, and every second rack row adds another one. The gantry layout attacks that ratio directly: the truck never enters the storage area. What follows is how the machine works, where the density comes from, and which Herochu model fits a given pipe length and load.
How does the gantry reach every shelf position?
Three axes do the work. Two floor-mounted rails carry the bridge along the bay, a trolley crosses the bridge, and a mast lifts the fork or bin to the requested level. Travel runs at 5 to 30 m/min and lifting at 5 to 15 m/min, with ±2 mm repeatability at the pick face.
Position feedback comes from servo encoders referenced against the rack, so the control knows each shelf address as rack, level and column. After a power interruption the gantry re-homes before it accepts a job. Because the machine is the only thing moving inside the tower, the aisle is sized to the gantry envelope, typically 1.6 to 2.0 m, rather than to a laden forklift.
Where does the space saving actually come from?
Take a 40 m wide bay. Ten double-sided cantilever rows need five aisles of about 3.2 m, which removes 16 m of width from storage. The same ten rows in a gantry tower need one aisle of 2 m, leaving 38 m for rack. That is the trick, and why the payback case rests on floor area rather than labour alone.
Height works the other way. Eight levels at roughly 1.1 m pitch need about 9 m of rack plus clearance for the bridge, so a 10 to 11 m eaves height is the practical entry point for the tallest model. Below 8 m, fewer levels still beat a forklift layout, but the gain per square metre is smaller.
What does 3,000 to 5,000 kg per level demand from the building?
Rack columns carry the stored steel; the two rails carry the gantry and its load. That split matters in a retrofit, because rail line loads are concentrated and must be checked against the existing slab before anything is ordered. Herochu issues foundation drawings with the layout so the civil work can be priced locally.
On site, rail alignment is checked over the full run. A deviation that would be invisible at floor level becomes a positioning error at the top level, where the mast has the longest lever. Grouted base plates and chemical anchors are normal; a separate mass concrete foundation is only needed where the slab is thin or heavily jointed.
Can the PLC run inventory without a WMS?
Yes, and most first installations do. Every position has an address, and the touchscreen shows what sits in it, how long it has been there and whether it is free, reserved or blocked. Bookings can be made at the terminal or from a desk PC, and stock lists export to CSV for the ERP.
Where a WMS or ERP exists, the same data moves over Modbus TCP or OPC UA. The distinction worth keeping in the interface is between stock on hand and stock available: a bundle already allocated to a cutting list should not be offered to the next order.
Which model fits which pipe length?
|
Model |
Pipe length |
Levels |
Max. load per level |
|
|
HC-X6053-8 |
6,000 mm |
5 |
3,000 kg |
8 |
|
HC-X7065-10 |
7,000 mm |
6 |
5,000 kg |
10 |
|
HC-X8085-10 |
8,000 mm |
8 |
5,000 kg |
10 |
Levels and rack counts are customized, and the figures above are the standard builds. Total positions are the product of the two: ten racks at eight levels gives 80 positions. That number, not the tonnage, belongs in a tender comparison.
What does installation look like in a working bay?
The sequence is rails, rack modules, gantry, power and commissioning. The bay is closed for the rail and rack phase, usually two to four weeks depending on length, and the gantry arrives in sections, then is aligned and dry-cycled before load tests. Herochu commissions with test bundles at rated load and trains operators on the same screen they will use in production.
When is a gantry ASRS the wrong purchase?
Three cases. First, very low movement: below roughly ten to fifteen moves per shift, a forklift and cantilever rack cost less to own. Second, a slab that cannot take concentrated rail loads without major civil work. Third, a bay narrower than about 14 m, where the tower and its aisle leave too little room for inbound staging to justify the machine.
None of these is an argument against automation, only against automating the wrong bay. The density case is strongest where floor area is expensive, stock is long and heavy, and the same bundles are touched several times before dispatch.
How much floor space does a gantry ASRS free up?
In a bay of ten rack rows, consolidating five forklift aisles into one gantry aisle typically returns 25 to 35% of the floor to storage, depending on row count and building width.
What repeatability does the Herochu gantry hold?
±2 mm at the pick face, which is enough for fork entry into a divided bin without contact and for label reading at the station.
Can one system store bundles and single bars?
Yes. Bins take loose and short material while the fork handles banded bundles, and the PLC treats each position as having its own weight limit.
What maintenance is involved?
Weekly visual checks, monthly rail cleaning and lubrication, and an annual inspection of gearboxes, brakes and safety circuits.
FAQ
Here are some frequently asked questions about our sheet metal racks and pipe storage solutions. We hope you find them helpful!
Q1: Can I request a custom size or color?
Absolutely. We offer complimentary design services and deliver efficient, tailored solutions to meet your specific requirements.
Q2: Are you a manufacturer or a distributor?
We are a direct manufacturer with over 15 years of industry experience and expertise.
Q3: Is there a minimum order quantity?
No. We welcome orders of any size, starting from a single unit.
Q4: How can I get detailed product information?
Click the “Get a Quote” button to receive product images, detailed specifications, and videos. Our team is always ready to assist.
Q5: How do I provide my storage rack requirements?
Simply share the type, dimensions, and quantity of materials you plan to store, along with any other specific needs. We will develop a professional storage solution for you. Alternatively, leave your contact details for a personalized consultation.
Q6: Do you offer automated loading systems or robotic arms?
Yes. We provide loading robotic arms and integrated loading/unloading systems tailored to your laser cutting machine’s table size and material handling method (e.g., board rack, exchange platform, or material warehouse). Contact us with your details for a customized proposal.
Q7: Do you provide on-site installation and debugging?
Yes. Our technicians can travel to your facility for installation and debugging, ensuring successful operation. We have served clients globally, including in the USA, South Korea, Russia, Qatar, Mexico, South Africa, Egypt, and Lebanon.
Q8: How do you ensure product quality?
Our quality assurance includes:
A team of over 40 technical engineers for professional debugging and support.
A dedicated quality control department compliant with ISO9001 standards.
CE certification for all exports.
Rigorous load testing before shipment to ensure structural safety and reliability.
Q9: Where is your factory located?
Our modern 10,000-square-meter manufacturing facility is located in Jiyang Industrial Park, Jinan, Shandong, China.
Q10: How can I evaluate your company’s capabilities?
We offer virtual video factory tours and warmly welcome on-site visits.
Q11: What does your company specialize in?
Jinan Constant Storage Machinery Manufacturing Co., Ltd. is a high-tech enterprise specializing in the R&D, production, sales, installation, and service of intelligent storage solutions. Our product range includes sheet material warehouses, drawer-style shelves, cantilever racks, servo manipulators, gantry loaders, and fully automated handling systems. Supported by a skilled technical team and advanced equipment, we are committed to delivering high-performance storage products and solutions to customers worldwide.
Customer visit
Herochu has always been adhering to the market-centric approach to meet customer requirements to the maximum extent, and the business philosophy of “creating brands with heart and gaining reputation with sincerity”. It provides customers with high-quality products and services with rigorous military quality, professionalism, and excellence, and has won unanimous praise in the Chinese aerospace, Chinese weapons, Chinese railways, automobile manufacturing, engineering machinery, non-ferrous metal titanium alloy and other industries.
Factory
Hot Selling Machines
-
Gantry-Type Material Library
Gantry Automated Long Goods Storage System for Steel Profiles and Bar Stock
Read moreRated 0 out of 5 -
Gantry-Type Material Library
Gantry Automated Long Material Storage System for Steel Pipe, Bar and Profile Warehouse
Read moreRated 0 out of 5 -
Automated Pipe Material Storage Warehouse
Gantry Automated Storage and Retrieval System for a High-Density Steel Warehouse
Read moreRated 0 out of 5 -
Automatic Sheet Metal Storage System
Goods-to-Person Automated Sheet Metal Storage & Retrieval System
Read moreRated 0 out of 5 -
Automation Sheet Metal Material Warehouse
Automated Sheet Metal Buffer Storage with WMS Integration for Laser Cutting
Read moreRated 0 out of 5 -
Automatic Sheet Metal Storage System
Smart ASRS Vertical Sheet Metal Storage Warehouse with Laser Cutting Buffer Integration
Read moreRated 0 out of 5 -
Automation Sheet Metal Material Warehouse
Large-Format ASRS Sheet Metal Storage Tower for Fiber Laser Cutting Integration
Read moreRated 0 out of 5 -
Electric Telescopic Pipe Cantilever Storage Rack
High-Density Telescopic Cantilever Rack for Round Pipe and Tube Storage
Read moreRated 0 out of 5
Related products
-
Pipe Storage Rack
Horizontal Pipe Storage Rack | Industrial pipe storage racks
Read moreRated 0 out of 5 -
Automation Sheet Metal Material Warehouse
Automatic sheet plate storage warehouse
Read moreRated 0 out of 5
















