A panel AS/RS for a plant warehouse stores sheet and plate in two to four towers inside one aisle, with an automated extractor moving trays between the tower and a load-out cart. The layout needs roughly 4-5 m of usable height, one interlocked aisle and defined in and out points. Herochu builds these units for sheets up to 6,000 x 2,000 mm.
Start with the building, not the brochure
Panel storage projects fail on height more often than on payload. A multi-tower unit needs headroom above the top level for the lift carriage and its guard, plus a maintenance gap. On a twelve-layer unit with 240 mm clear space the tower is a few metres tall, but mast, carriage and roof clearance add to that. Measure from finished floor to the lowest obstruction, sprinkler drops and crane rails included.
The second check is the column grid. A column landing mid-line either splits the tower bank or forces the layout to move. A 20 m clear bay suits four towers with the load-out at one end; a 12 m bay usually means the store runs along the wall, cart travelling parallel to the cutting line.
What the AS/RS consists of
Three subsystems do the work:
- The tower bank. Steel frames with fixed levels, each carrying a tray or supports sized for the sheet family in that slot.
- The extraction and lift unit. A mast with a carriage that travels vertically and an extractor that reaches into the level, lifts the tray clear and retracts it into the aisle.
- The transfer interface. A cart or conveyor that takes the tray and delivers the sheet to the machine or a pick station.
Control sits above all three: the PLC runs motion and interlocks, the WMS owns slots and stock records, and the ERP exchanges demand and receipt data. In a Herochu installation one touchscreen serves all three.
Footprint: what vertical storage recovers
A stack of 3,000 x 1,500 mm sheets occupies floor area whether it holds four sheets or forty. Retrieval needs clearance around every stack, and that clearance is what consumes a fabrication bay. Once stacks become towers, handling space collapses into a single aisle.
Herochu specifies up to 50 percent floor space recovery against equivalent stacking. Treat it as a planning target, not a guarantee: count the stacks, measure the gangway around each, and compare that total with the tower footprint plus one aisle.

Throughput: how many calls per hour
A single extractor is a serial device: travel to the slot, extract, lower, transfer to the cart, return. At 5-15 m/min with typical travel of 10-25 m, most calls finish in one to three minutes including handover.
For planning, assume 15 to 25 completed calls per hour with realistic gaps, not the theoretical maximum. That covers a laser cell consuming six to ten sheets an hour plus changeover returns. It does not cover two cutting machines running different nests at high tempo, which is where a second extractor or a second bank earns its cost.
Designing the flow around the machine
The layout choice that affects daily output most is where the cart hands off:
- Direct to machine. The cart runs to the laser or punch load station. Fastest for one high-consumption machine, but the cart is committed for the whole trip.
- Buffer station. The cart drops the sheet at a two- or three-position buffer beside the machine, so one retrieval serves several nests and the machine never waits on the tower.
- Manual pick bay. The cart delivers to an open station where an operator takes the sheet with a lifter. Suits mixed production and frequent alloy changes.
Most plants end up with a buffer plus a manual bay: storage and cutting cycles separate, and maintenance gets room without stopping production.
Retrofitting an existing warehouse
An existing bay can usually take a multi-tower unit if three conditions hold: floor level within tolerance, slab capacity for the point loads, and a cart route clear of forklift lanes. Erection and commissioning follow a fixed sequence, and the machine is tested with the customer’s own sheets.
Power and data are modest: three-phase supply, a network drop for the WMS, and clean compressed air if the cart uses vacuum cups. What takes planning time is the material master. Every sheet family needs dimensions, gauge, alloy and a slot rule before the first scan, or the store fills with unclassified stock in a week.

The specification set that matters
| Parameter | Range | Why it matters in layout |
|---|---|---|
| Sheet size | 3,000 x 1,500 to 6,000 x 2,000 mm | Sets tower length and aisle run |
| Towers | 2 to 4, customised | Drives throughput and segregation |
| Layers | 6 to 12, customised | Sets height and total capacity |
| Load per level | 3,000 to 5,000 kg | Governs slab and tray design |
| Transfer speed | 5-15 m/min | Sets cycle time and call rate |
| Repeatability | ±2 mm | Protects machine datums at handover |
A plant expecting growth should order the frame for the final tower count and populate it in stages: adding a tower to a prepared bank is a mechanical job, rebuilding an aisle is not.
FAQ
How much height does a multi-tower panel AS/RS need? Plan 4-5 m of usable height on a standard twelve-layer unit, plus code clearance above the mast. Confirm against the actual level count.
Can it be installed without stopping production? Usually yes. Erection and commissioning happen in the storage bay, and the cart route stays clear of active cells until handover.
Does the AS/RS work with mixed sheet sizes in one tower? Yes, as long as each level’s tray suits the largest sheet assigned to it. Slot rules in the WMS handle the rest.
What data does the ERP need? Material master records, open production orders and a receipt interface for goods-in. Herochu maps these fields during commissioning.
Herochu supplies the tower bank, extractor, cart and WMS interface as one system, and reviews the building survey before the layout is frozen.