<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Automatic Tube Bundle Storage and Retrieval System &#8211; Sheet Metal &amp; Pipe Storage Racks Manufacturer | Heavy-Duty Cantilever Racking Systems</title>
	<atom:link href="https://www.herochu.com/product-category/products/automated-storage-systems/automatic-tube-bundle-storage-and-retrieval-system/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.herochu.com</link>
	<description>Herochu Machinery</description>
	<lastBuildDate>Sat, 28 Nov 2026 05:44:50 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.5</generator>

<image>
	<url>https://www.herochu.com/wp-content/uploads/2025/09/cropped-0206-32x32.png</url>
	<title>Automatic Tube Bundle Storage and Retrieval System &#8211; Sheet Metal &amp; Pipe Storage Racks Manufacturer | Heavy-Duty Cantilever Racking Systems</title>
	<link>https://www.herochu.com</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Automated Pipe Bundle Storage and Retrieval System for Laser Pipe Cutting Machine</title>
		<link>https://www.herochu.com/product/automated-pipe-bundle-storage-and-retrieval-system-for-laser-pipe-cutting-machine/</link>
		
		<dc:creator><![CDATA[herochu]]></dc:creator>
		<pubDate>Sat, 28 Nov 2026 05:44:50 +0000</pubDate>
				<guid isPermaLink="false">https://www.herochu.com/?post_type=product&#038;p=14622</guid>

					<description><![CDATA[<p data-docx-p-idx="7">QUICK ANSWER An automated pipe bundle storage and retrieval system holds bundles of pipe in vertical towers and moves them with a rail-mounted gantry, so a laser pipe cutting machine receives the right bundle at the transfer station without a forklift in the aisle. Pipe length, level count, load per level and tower count set the capacity.Buying pipe storage after the laser is installed is a common sequence, and the reason so many new cutting cells still run on floor stacks. The machine is chosen on cut quality and speed, the building on rent, and the material flow between them is left to whatever crane was already there. An automated pipe bundle storage and retrieval system is the part of the cell that makes the other two decisions pay.</p>]]></description>
										<content:encoded><![CDATA[<div class="ast-oembed-container " style="height: 100%;"><iframe title="Fully Automatic Warehouse Storage System Integrated with Gantry Loading Robot  #storagesolutions" width="1200" height="675" src="https://www.youtube.com/embed/SB3UACAHVwI?feature=oembed" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe></div>
<p data-docx-p-idx="8">Buying <a href="https://www.herochu.com/heavy-duty-warehouse-pipe-storage-cantilever-racking-system/">pipe storage</a> after the <a href="https://www.herochu.com/product/sheet-material-rack-for-laser-plasma-and-cutting-machines/">laser</a> is installed is a common sequence, and the reason so many new cutting cells still run on floor stacks. The machine is chosen on cut quality and speed, the building on rent, and the <a href="https://www.herochu.com/product/pipe-storage-material-warehouse-2/">material</a> flow between them is left to whatever crane was already there. An <a href="https://www.herochu.com/automated-metal-sheet-handling-solutions-swing-arm-manipulator/">automated</a> <a href="https://www.herochu.com/pipe-cantilever-storage-system/">pipe</a> bundle <a href="https://www.herochu.com/smart-organized-storage-for-metal-sheets/">storage</a> and <a href="https://www.herochu.com/automated-warehouse-storage-retrieval-system-for-heavy-duty-sheet-metal/">retrieval system</a> is the part of the cell that makes the other two decisions pay.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="9">Which model fits your pipe length and bundle weight?</p>
<p data-docx-p-idx="10">Three base configurations cover most <a href="https://www.herochu.com/product/tube-bar-cantilever-rack-bars-and-tubes-storage-systems/">tube</a> and pipe mills, and each is <a href="https://www.herochu.com/heavy-duty-customized-vacuum-cantilever-crane-metal-sheet-vacuum-lifters/">customized</a> rather than <a href="https://www.herochu.com/roll-out-vs-fixed-cantilever-racks-a-cost-benefit-analysis/">fixed</a>. The starting point is pipe length, then load per level, then the number of levels the building can take.</p>
<p data-docx-p-idx="11">Table 1. <a href="https://www.herochu.com/pipe-bundle-gantry-automated-storage-solution/">Pipe bundle</a> storage models</p>
<table class="first-row first-col no-vband phoenix-docx-preview-docx_tablegrid">
<colgroup>
<col />
<col />
<col />
<col />
<col /></colgroup>
<tbody>
<tr>
<td>
<p data-docx-p-idx="12">Model</p>
</td>
<td>
<p data-docx-p-idx="13">Pipe length</p>
</td>
<td>
<p data-docx-p-idx="14">Levels</p>
</td>
<td>
<p data-docx-p-idx="15">Load per level</p>
</td>
<td>
<p data-docx-p-idx="16">Towers</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="17">HC-XG6053-6</p>
</td>
<td>
<p data-docx-p-idx="18">6000 mm</p>
</td>
<td>
<p data-docx-p-idx="19">5</p>
</td>
<td>
<p data-docx-p-idx="20">3000 kg</p>
</td>
<td>
<p data-docx-p-idx="21">6</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="22">HC-XG8055-8</p>
</td>
<td>
<p data-docx-p-idx="23">8000 mm</p>
</td>
<td>
<p data-docx-p-idx="24">5</p>
</td>
<td>
<p data-docx-p-idx="25">5000 kg</p>
</td>
<td>
<p data-docx-p-idx="26">8</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="27">HC-XG8085-10</p>
</td>
<td>
<p data-docx-p-idx="28">8000 mm</p>
</td>
<td>
<p data-docx-p-idx="29">8</p>
</td>
<td>
<p data-docx-p-idx="30">5000 kg</p>
</td>
<td>
<p data-docx-p-idx="31">10</p>
</td>
</tr>
</tbody>
</table>
<p data-docx-p-idx="32">All values <a href="https://www.herochu.com/customizable-sheet-metal-storage-shelves-space-efficient-sheet-metal-racks/">customizable</a>. <a href="https://www.herochu.com/product/fully-automatic-plate-gantry-loading-and-unloading-robot-manipulator-with-drawer-type-sheet-metal-rack/">Gantry</a> travel 5-30 m/min, <a href="https://www.herochu.com/video%ef%bc%9aautomation-fiber-laser-cutting-machines-lifting-and-handling-systems/">lifting</a> 5-15 m/min, repeatability plus or minus 2 mm.</p>
<p data-docx-p-idx="33">A 6 m cutting line with moderate stock usually lands on the 6053, because a 6 m bundle does not need an 8 m tower and the shorter <a href="https://www.herochu.com/industrial-high-capacity-rail-telescopic-cantilever-rack-system-solution-for-profile-steel-metal-pipe/">rail</a> means less travel per cycle. An 8 m line running <a href="https://www.herochu.com/product/heavy-weight-capacity-cantilever-racking/">heavy</a> wall pipe moves to the 8055, and a plant that wants deep stock and a small footprint goes to the 8085, accepting a taller structure and a longer lift in exchange for density.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="34">What belongs on the specification <a href="https://www.herochu.com/product/drawer-type-storage-system-of-sheet-and-plate-material-for-laser-cutter/">sheet</a>?</p>
<p data-docx-p-idx="35">Most disputes in this <a href="https://www.herochu.com/product/heavy-duty-sheet-metal-storage-equipment/">equipment</a> <a href="https://www.herochu.com/product/roll-out-steel-sheet-storage-racks-storage-and-category-management-sheet-racking/">category</a> trace back to a specification that described tonnage but not geometry. The sheet should fix the items below before any quotation is compared, because two <a href="https://www.herochu.com/sheet-metal-shelf-with-drawers-suppliers-factory/">suppliers</a> can both quote 5000 kg and mean different things.</p>
<p data-docx-p-idx="36">Table 2. Specification checklist before comparing quotations</p>
<table class="first-row first-col no-vband phoenix-docx-preview-docx_tablegrid">
<colgroup>
<col />
<col /></colgroup>
<tbody>
<tr>
<td>
<p data-docx-p-idx="37">Item</p>
</td>
<td>
<p data-docx-p-idx="38">What to confirm</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="39">Pipe length range</p>
</td>
<td>
<p data-docx-p-idx="40">Minimum and maximum, including short <a href="https://www.herochu.com/vertical-pull-out-sheet-metal-scrap-rack-for-laser-cutting-waste-remnants/">remnants</a></p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="41">Load per level</p>
</td>
<td>
<p data-docx-p-idx="42">Rated load per cassette, not an average across the <a href="https://www.herochu.com/how-to-store-stainless-steel-plates/">store</a></p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="43">Levels and tower count</p>
</td>
<td>
<p data-docx-p-idx="44">Fixed or <a href="https://www.herochu.com/product/expandable-cantilever-racking-for-long-materials-and-profile-storage/">expandable</a>, and the height each option needs</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="45">Travel and lift speed</p>
</td>
<td>
<p data-docx-p-idx="46">Rated under load, with the acceleration used</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="47">Repeatability</p>
</td>
<td>
<p data-docx-p-idx="48">Value and measurement method, at the load</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="49">Control architecture</p>
</td>
<td>
<p data-docx-p-idx="50">PLC type, HMI functions, WMS or WCS scope, API</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="51">Downstream interface</p>
</td>
<td>
<p data-docx-p-idx="52">Transfer station <a href="https://www.herochu.com/product/optimize-laser-cutting-workshop-storage-layout/">layout</a> and signal handshake</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="53">Scope split</p>
</td>
<td>
<p data-docx-p-idx="54">What is supplied, what the site supplies, who commissions</p>
</td>
</tr>
</tbody>
</table>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="55">How does the system hand a bundle to the laser?</p>
<p data-docx-p-idx="56">The gantry delivers the bundle to a loading station, where the strapping is opened and <a href="https://www.herochu.com/product/single-and-double-sided-cantilever-racks/">single</a> <a href="https://www.herochu.com/automated-vertical-storage-systems-for-platesprofiles-and-pipes/">pipes</a> move to the laser infeed. That station is the buffer between bulk storage and the cutting cycle, and its size decides how often the gantry interrupts a cut to fetch material. Too small and the laser waits; too large and the buffer becomes a second, unmanaged store on the floor.</p>
<p data-docx-p-idx="57">Remnants come back the same way. A partly cut pipe returns to the station, is measured and given a new address, and the record shows a shorter length at a new slot. Without that step, <a href="https://www.herochu.com/product/sheet-plate-remnant-rack-for-laser-cutter/">remnant</a> stock accumulates in corners and the store slowly loses the space it was bought to create.</p>
<p data-docx-p-idx="58">Buffer size is set from cycle times, not from <a href="https://www.herochu.com/vertical-metal-offcut-storage-rack-heavy-duty-floor-space-optimization-and-lean-material-management/">floor space</a>. If one bundle covers four hours of cutting, the gantry makes three moves a day instead of twenty and the laser never waits for a crane. <a href="https://www.herochu.com/videoitalian-clients-are-coming-to-herochu-for-a-factory-audit/">Herochu</a> calculates that ratio from the cut list before the layout is frozen.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="59">What does the site need before installation?</p>
<p data-docx-p-idx="60">Four items decide the schedule more than the machine: the rail foundation and floor tolerance, clear height under roof and sprinkler, power and network drops at the control cabinet, and a defined <a href="https://www.herochu.com/maximize-space-safety-a-guide-to-8-ton-single-layer-steel-plate-racks/">safety</a> zone around gantry travel. A survey before <a href="https://www.herochu.com/beyond-storage-the-herochu-orchestration-system-for-modern-fabrication/">fabrication</a> is cheaper than a correction after the rails are grouted.</p>
<p data-docx-p-idx="61">Commissioning runs in a fixed order: mechanical assembly and rail alignment, <a href="https://www.herochu.com/electrical-panel-lifting-equipment/">electrical</a> and safety circuit checks, dry cycles, load testing at rated <a href="https://www.herochu.com/horizontal-vs-cantilever-roll-out-racks-choosing-the-right-10000-lb-capacity-system/">capacity</a>, then integration with the transfer station and the cutting machine. Herochu issues the sequence with the layout, so the plant can plan crane time and downtime around it.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="62">What changes in daily operation?</p>
<p data-docx-p-idx="63">The obvious change is that a <a href="https://www.herochu.com/forklift-compatible-sheet-metal-pallet-racking/">forklift</a> no longer enters the storage aisle, which removes the highest-risk interaction in most pipe shops. The less obvious change is that the store becomes the single source of truth for stock: what is on hand, what is reserved, and what is left of a partly cut bundle. Herochu writes that record at the slot, so a planner can promise a delivery date without walking the floor.</p>
<p data-docx-p-idx="64">Operators need training on two things only: the HMI transaction for <a href="https://www.herochu.com/product/manual-telescopic-cantilever-rack-manual-cranked-type-cantilever-racking-for-long-materials/">manual</a> moves, and the recovery procedure after a fault. Both are short, and both are documented, because a store that only one person can operate is a single point of failure.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="65"><a href="https://www.herochu.com/frequently-asked-questions-of-horizontal-panel-racks/">Frequently asked questions</a></p>
<p data-docx-p-idx="66">Can the system store pipe in bundles and as single lengths? Yes. Cassettes can be configured for bundle support and for single or loose lengths, and the layout usually separates the two so short pieces do not migrate into bundle slots.</p>
<p data-docx-p-idx="67">Is a pit or special floor required? Normally no pit. The rails sit on a prepared foundation with a defined tolerance, and the requirement is confirmed after the floor survey rather than assumed at quotation.</p>
<p data-docx-p-idx="68">How is stock accuracy maintained over time? Every move is a transaction at a slot, and any mismatch blocks the address until it is cleared. Scheduled cycle counts then verify a small number of slots instead of stopping the store for a full count.</p>
<p data-docx-p-idx="69">Can the store be expanded later? Yes, within the limits set at the layout stage. Rail length, control capacity and building height determine how much expansion is possible, which is why Herochu asks for a three to five year growth figure at the start.</p>
<p data-docx-p-idx="70">A <a href="https://www.herochu.com/pipe-store-long-span-goods-automated-storage-system/">pipe store</a> is judged on the shift it does not interrupt. Herochu delivers the tower structure, the gantry, the controls and the integration as one scope, with a 2D and 3D layout, a capacity calculation and a detailed quotation inside 12 hours.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Tube Bundle AS/RS Solution for Tube Laser Cutting Machine</title>
		<link>https://www.herochu.com/product/tube-bundle-as-rs-solution-for-tube-laser-cutting-machine/</link>
		
		<dc:creator><![CDATA[herochu]]></dc:creator>
		<pubDate>Sat, 28 Nov 2026 05:34:57 +0000</pubDate>
				<guid isPermaLink="false">https://www.herochu.com/?post_type=product&#038;p=14620</guid>

					<description><![CDATA[<p data-docx-p-idx="7">QUICK ANSWER A tube bundle AS/RS stores bundles in vertical towers along a rail and uses a gantry crane to move them between storage and the cutting line. Capacity comes from tower count, level count and load per level, so the layout is sized from the bundle mix rather than from whatever floor happens to be free.Tube storage is usually the last part of a laser cutting project to be planned and the first to become a constraint. The machine is specified to cut 8 m tube at speed, then fed from a floor stack three bundles deep while operators spend the shift moving material. A tube bundle AS/RS closes that gap by treating storage as part of the line, not as a yard at the back of the building.</p>]]></description>
										<content:encoded><![CDATA[<div class="ast-oembed-container " style="height: 100%;"><iframe title="Automatic Pipe Storage System #lasercutting #storagesolutions" width="1200" height="675" src="https://www.youtube.com/embed/fPKAdbLnJe8?feature=oembed" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe></div>
<p data-docx-p-idx="8"><a href="https://www.herochu.com/product/tube-bar-cantilever-rack-bars-and-tubes-storage-systems/">Tube</a> <a href="https://www.herochu.com/smart-organized-storage-for-metal-sheets/">storage</a> is usually the last part of a <a href="https://www.herochu.com/loading-and-unloading-system-for-laser-cutting/">laser cutting</a> project to be planned and the first to become a constraint. The machine is specified to cut 8 m tube at speed, then fed from a floor stack three bundles deep while operators spend the shift moving <a href="https://www.herochu.com/product/pipe-storage-material-warehouse-2/">material</a>. A <a href="https://www.herochu.com/tube-bundle-automated-storage-retrieval-solution-for-cnc-laser-tube-cutting-machine/">tube bundle</a> <a href="https://www.herochu.com/product/automatic-sheet-metal-storage-retrieval-system-as-rs-2/">AS/RS</a> closes that gap by treating storage as part of the line, not as a yard at the back of the building.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="9">What is included in a <a href="https://www.herochu.com/is-a-tube-bundle-as-rs-only-for-new-buildings/">tube bundle AS/RS</a>?</p>
<p data-docx-p-idx="10">Five subsystems have to work as one: the <a href="https://www.herochu.com/optimized-racking-for-4x8-aluminum-sheets-6x20-steel-plates/">racking</a> towers, the rail-mounted <a href="https://www.herochu.com/product/fully-automatic-plate-gantry-loading-and-unloading-robot-manipulator-with-drawer-type-sheet-metal-rack/">gantry</a>, the cassettes, the <a href="https://www.herochu.com/laser-cutting-machine-with-auto-loading-and-unloading-system/">loading and unloading</a> stations, and the WMS or WCS layer that issues commands. <a href="https://www.herochu.com/videoitalian-clients-are-coming-to-herochu-for-a-factory-audit/">Herochu</a> builds all five, which matters at the interfaces, where most lost performance sits between one supplier&#8217;s mechanical scope and another&#8217;s control scope.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="11">How much floor space does <a href="https://www.herochu.com/fully-automated-center-for-laser-sheet-metal-cutting-with-vertical-storage-system/">vertical storage</a> return?</p>
<p data-docx-p-idx="12">A 6 m bundle stacked on the floor occupies its footprint plus the aisle a <a href="https://www.herochu.com/forklift-compatible-sheet-metal-pallet-racking/">forklift</a> needs, and the stack rarely goes more than two or three high before <a href="https://www.herochu.com/automatic-handling-and-unloading-manipulator-economic-efficiency-and-operational-agility/">handling</a> becomes unsafe. A <a href="https://www.herochu.com/herochu-cantilever-racks-single-sided-vs-double-sided-choosing-the-right-storage-solution-for-your-workshop/">double-sided</a> <a href="https://www.herochu.com/product/optimize-laser-cutting-workshop-storage-layout/">layout</a> uses one gantry aisle for two banks of <a href="https://www.herochu.com/cantilever-steel-bar-tubing-pipe-storage-racks/">cantilever</a> arms, so storage grows upward. Herochu quotes up to 80% footprint reduction, and the figure holds when the building has the clear height.</p>
<p data-docx-p-idx="13">Clear height is the first constraint to check. The standard upright is 6000 mm, and the model with eight levels needs more building height than the five-level version, plus space for sprinkler clearance and any overhead crane. A layout that ignores the roof will not survive the first site survey.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="14">Which configuration matches 6 m and 8 m bundles?</p>
<p data-docx-p-idx="15">Three base models cover the common range, and every column in the table is <a href="https://www.herochu.com/customizable-sheet-metal-storage-shelves-space-efficient-sheet-metal-racks/">customizable</a> to the material list. The 6053 model suits 6 m tube at 3000 kg per level, while the 8055 and 8085 models take 8 m tube at 5000 kg per level and differ mainly in level count and tower count.</p>
<p data-docx-p-idx="16">Table 1. Tube bundle AS/RS configurations</p>
<table class="first-row first-col no-vband phoenix-docx-preview-docx_tablegrid">
<colgroup>
<col />
<col />
<col />
<col />
<col /></colgroup>
<tbody>
<tr>
<td>
<p data-docx-p-idx="17">Model</p>
</td>
<td>
<p data-docx-p-idx="18"><a href="https://www.herochu.com/pipe-cantilever-storage-system/">Pipe</a> length</p>
</td>
<td>
<p data-docx-p-idx="19">Levels</p>
</td>
<td>
<p data-docx-p-idx="20">Load per level</p>
</td>
<td>
<p data-docx-p-idx="21">Towers</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="22">HC-XG6053-6</p>
</td>
<td>
<p data-docx-p-idx="23">6000 mm</p>
</td>
<td>
<p data-docx-p-idx="24">5 (<a href="https://www.herochu.com/heavy-duty-customized-vacuum-cantilever-crane-metal-sheet-vacuum-lifters/">customized</a>)</p>
</td>
<td>
<p data-docx-p-idx="25">3000 kg</p>
</td>
<td>
<p data-docx-p-idx="26">6 (customized)</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="27">HC-XG8055-8</p>
</td>
<td>
<p data-docx-p-idx="28">8000 mm</p>
</td>
<td>
<p data-docx-p-idx="29">5 (customized)</p>
</td>
<td>
<p data-docx-p-idx="30">5000 kg</p>
</td>
<td>
<p data-docx-p-idx="31">8 (customized)</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="32">HC-XG8085-10</p>
</td>
<td>
<p data-docx-p-idx="33">8000 mm</p>
</td>
<td>
<p data-docx-p-idx="34">8 (customized)</p>
</td>
<td>
<p data-docx-p-idx="35">5000 kg</p>
</td>
<td>
<p data-docx-p-idx="36">10 (customized)</p>
</td>
</tr>
</tbody>
</table>
<p data-docx-p-idx="37">Gantry travel 5-30 m/min, <a href="https://www.herochu.com/video%ef%bc%9aautomation-fiber-laser-cutting-machines-lifting-and-handling-systems/">lifting</a> 5-15 m/min, repeatability plus or minus 2 mm. Cantilever arms 800 mm, upright height 6000 mm.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="38">How do you size tower count and levels?</p>
<p data-docx-p-idx="39">Sizing starts from the bundle mix, not from tonnage. The inputs that change the answer are the number of tube sizes held, bundles in and out per day, the shift pattern, the 6 m to 8 m length mix, and how much <a href="https://www.herochu.com/product/sheet-plate-remnant-rack-for-laser-cutter/">remnant</a> stock the plant keeps. A shop cutting one diameter needs fewer addresses than a job shop running forty sizes through the same tower.</p>
<p data-docx-p-idx="40">Tower count and gantry travel trade against each other. More towers <a href="https://www.herochu.com/how-to-store-stainless-steel-plates/">store</a> more bundles, but the gantry covers more <a href="https://www.herochu.com/industrial-high-capacity-rail-telescopic-cantilever-rack-system-solution-for-profile-steel-metal-pipe/">rail</a> per cycle, so hourly throughput can fall unless a second gantry is added. Fewer, taller towers raise density and cut travel, at the cost of a longer lift and a taller building. The answer usually appears when both cases are drawn in one 3D layout.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="41">How does the store connect to the <a href="https://www.herochu.com/product/sheet-material-rack-for-laser-plasma-and-cutting-machines/">laser</a>?</p>
<p data-docx-p-idx="42">The connection is a transfer station, not a conveyor bolted to the machine. The gantry delivers a bundle to the station, the bundle is opened there, and <a href="https://www.herochu.com/product/single-and-double-sided-cantilever-racks/">single</a> <a href="https://www.herochu.com/product/automated-long-goods-storage-system-rods-profiles-panels-tubes-pipes/">tubes</a> move forward to the <a href="https://www.herochu.com/product/laser-loading-unloading-system/">laser loading system</a>. Cutting the bundle open inside the tower is not a <a href="https://www.herochu.com/product/steel-plate-racking-system-sheet-metal-storage-rack-design/">design</a> option, because the tower is a storage structure and not a destrapping area.</p>
<p data-docx-p-idx="43">Sequencing matters as much as hardware. If bundles are issued in the order the schedule needs them, the laser queue and the buffer stay short. If they are issued in the order they sit in the tower, the operator rebuilds the schedule at the machine and the <a href="https://www.herochu.com/video%ef%bc%9aautomation-two-tow-two-loading-and-unloading-two-tower-plate-storage-warehouse/">automation</a> has bought nothing.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="44">What planning inputs does Herochu need?</p>
<p data-docx-p-idx="45">A material list with tube sizes, lengths and bundle weights; a drawing or dimensions of the hall, including column positions and clear height; the cutting schedule for a typical week; and the growth expected over three to five years. Herochu returns a 2D and 3D CAD layout, a <a href="https://www.herochu.com/horizontal-vs-cantilever-roll-out-racks-choosing-the-right-10000-lb-capacity-system/">capacity</a> calculation and a detailed quotation within 12 hours, which is fast enough to test two or three layout options before the building work is <a href="https://www.herochu.com/roll-out-vs-fixed-cantilever-racks-a-cost-benefit-analysis/">fixed</a>.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="46"><a href="https://www.herochu.com/frequently-asked-questions-of-horizontal-panel-racks/">Frequently asked questions</a></p>
<p data-docx-p-idx="47">Is a tube bundle AS/RS only for new buildings? No. Most projects go into an existing hall. The rail foundation, floor tolerance and clear height are surveyed first, and the layout is adjusted around columns, doors and existing <a href="https://www.herochu.com/product/heavy-duty-sheet-metal-storage-equipment/">equipment</a>.</p>
<p data-docx-p-idx="48">Can one gantry serve two <a href="https://www.herochu.com/gantry-robot-fully-automatic-sheet-metal-loading-and-unloading-for-cutting-machines/">cutting machines</a>? It can, if the throughput calculation covers both machines and the transfer stations keep travel short. The control layer then prioritises by work order rather than first-come order.</p>
<p data-docx-p-idx="49">How is a bundle weight of 5000 kg handled safely? The cassette, arm and tower are engineered for the stated load, and the gantry checks the load record before each move. Loads above the configured limit are refused by the controller rather than attempted.</p>
<p data-docx-p-idx="50">Does the system replace the overhead crane? In most layouts it removes <a href="https://www.herochu.com/product/sheet-metal-vacuum-crane-lifter/">the crane</a> from routine bundle handling. A crane may still be kept for maintenance lifts and for receiving if the infeed station is outside the gantry rails.</p>
<p data-docx-p-idx="51">The value of a tube bundle AS/RS is not the <a href="https://www.herochu.com/industrial-grade-long-piece-storage-equipment-hand-operated-telescopic-cantilever-shelf-for-steel-timber-aluminum-space-saving-heavy-duty-forklift-friendly/">steel</a> in the towers. It is the search, double handling and guesswork removed between a delivery and a cut part. Herochu plans that flow from the rail survey to the work order interface.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Automated Tube Bundle Inventory &#038; Retrieval System for Laser Tube Cutter</title>
		<link>https://www.herochu.com/product/automated-tube-bundle-inventory-retrieval-system-for-laser-tube-cutter/</link>
		
		<dc:creator><![CDATA[herochu]]></dc:creator>
		<pubDate>Sat, 28 Nov 2026 05:31:09 +0000</pubDate>
				<guid isPermaLink="false">https://www.herochu.com/?post_type=product&#038;p=14604</guid>

					<description><![CDATA[QUICK ANSWER An automated tube bundle inventory and retrieval system gives every incoming bundle a fixed address in a multi-level tower and moves it with a rail-mounted gantry under PLC control. Quantity, location, length and weight update with each transaction, so a tube laser is fed from confirmed stock instead of a floor pile.Most material problems at a tube laser start before the first cut. A bundle is unloaded, tagged by hand, pushed into a bay, and within a week nobody can confirm whether the 60.3 x 3.6 mm tube in front of them carries the heat number on the cutting plan. An inventory system tied to the storage position removes that doubt, because the slot becomes the record.]]></description>
										<content:encoded><![CDATA[<div class="ast-oembed-container " style="height: 100%;"><iframe title="Client inspecting the automated pipe storage system  #storagesolutions #rack #storagesystem #pipes" width="1200" height="675" src="https://www.youtube.com/embed/BhYUu1cE2Cc?feature=oembed" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe></div>
<p data-docx-p-idx="8">Most <a href="https://www.herochu.com/product/pipe-storage-material-warehouse-2/">material</a> problems at a <a href="https://www.herochu.com/product/tube-bar-cantilever-rack-bars-and-tubes-storage-systems/">tube</a> <a href="https://www.herochu.com/product/sheet-material-rack-for-laser-plasma-and-cutting-machines/">laser</a> start before the first cut. A bundle is unloaded, tagged by hand, pushed into a bay, and within a week nobody can confirm whether the 60.3 x 3.6 mm tube in front of them carries the heat number on the cutting plan. An inventory system tied to the <a href="https://www.herochu.com/smart-organized-storage-for-metal-sheets/">storage</a> position removes that doubt, because the slot becomes the record.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="9">What does the system record for every bundle?</p>
<p data-docx-p-idx="10">An <a href="https://www.herochu.com/automated-tubes-storage-warehouse-system/">automated tube</a> bundle inventory system earns its place by capturing each transaction once, at the point where the material is handled. In a <a href="https://www.herochu.com/videoitalian-clients-are-coming-to-herochu-for-a-factory-audit/">Herochu</a> <a href="https://www.herochu.com/product/fully-automatic-plate-gantry-loading-and-unloading-robot-manipulator-with-drawer-type-sheet-metal-rack/">gantry</a> <a href="https://www.herochu.com/how-to-store-stainless-steel-plates/">store</a>, each cassette position is a numbered address held in the PLC. When a bundle reaches the loading station, the receiving transaction captures the data the plant needs downstream, and the gantry then carries the bundle to that address. The record stays with the material until the bundle is consumed or returned, and it does not depend on a handwritten label surviving a week in a <a href="https://www.herochu.com/videohorizontal-sheet-metal-storage-rack-for-fiber-laser-workshop-sheet-material-storage/">workshop</a>.</p>
<p class="phoenix-docx-preview-docx_listbullet phoenix-docx-preview-docx-num-1-0" data-docx-p-idx="11">Bundle ID and heat number, for traceability through the cut part.</p>
<p class="phoenix-docx-preview-docx_listbullet phoenix-docx-preview-docx-num-1-0" data-docx-p-idx="12">Tube diameter, wall thickness and length, for <a href="https://www.herochu.com/product/automatic-profile-material-library-automated-retrieval-for-profile-inventory/">retrieval</a> planning.</p>
<p class="phoenix-docx-preview-docx_listbullet phoenix-docx-preview-docx-num-1-0" data-docx-p-idx="13">Bundle weight, so the gantry selects the correct load <a href="https://www.herochu.com/video%ef%bc%9aprofile-automatic-storage-unit-automatic-pipe-storage-rack/">profile</a> before the move.</p>
<p class="phoenix-docx-preview-docx_listbullet phoenix-docx-preview-docx-num-1-0" data-docx-p-idx="14">Slot address, so retrieval is a command rather than a search.</p>
<p class="phoenix-docx-preview-docx_listbullet phoenix-docx-preview-docx-num-1-0" data-docx-p-idx="15">Work order reservation, so a promised bundle is not issued to another job.</p>
<p class="phoenix-docx-preview-docx_listbullet phoenix-docx-preview-docx-num-1-0" data-docx-p-idx="16">Age in stock, to support first-in-first-out rotation.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="17">How does a bundle travel from receiving to the cutting table?</p>
<p data-docx-p-idx="18">The cycle has four movements, and each one writes to the same record. Receiving places the bundle on the infeed station and identifies it. Storage sends the gantry along the <a href="https://www.herochu.com/industrial-high-capacity-rail-telescopic-cantilever-rack-system-solution-for-profile-steel-metal-pipe/">rail</a> and lifts the bundle to the target level, where it is set into the cassette. Travel runs at 5-30 m/min and <a href="https://www.herochu.com/video%ef%bc%9aautomation-fiber-laser-cutting-machines-lifting-and-handling-systems/">lifting</a> at 5-15 m/min, with repeatability of plus or minus 2 mm at the seat.</p>
<p data-docx-p-idx="19">Retrieval starts with a work order. The gantry pulls the named bundle from its address and delivers it to the outfeed or transfer station at the tube laser. Return closes the loop: <a href="https://www.herochu.com/vertical-pull-out-sheet-metal-scrap-rack-for-laser-cutting-waste-remnants/">remnants</a> and unused lengths come back with a new measured length and a new address, ready for the next job. No second entry is made in a spreadsheet, and nothing is written on a whiteboard.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="20">Why does live stock display change the planning day?</p>
<p data-docx-p-idx="21">Idle minutes at a tube laser cost more than most people expect, and the minutes lost to walking the storage area are almost never logged. A live stock screen at the machine and in the planning office shows what is in the towers, at which level, and what is already committed. A planner can confirm tonight&#8217;s schedule without calling the <a href="https://www.herochu.com/smart-sheet-metal-warehouse-rack-system-automated-racking-system-for-warehouse/">warehouse</a>, and a buyer can see a grade dropping toward its reorder point before the line stops.</p>
<p data-docx-p-idx="22">The same screen closes the consumption loop: when a bundle is cut, the remaining length is booked back rather than estimated, which over a month is the difference between a store that reconciles and one that drifts.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="23">How does the store exchange data with ERP and MES?</p>
<p data-docx-p-idx="24">The <a href="https://www.herochu.com/fully-automated-center-for-laser-sheet-metal-cutting-with-vertical-storage-system/">storage system</a> runs on an <a href="https://www.herochu.com/product/heavy-duty-cantilever-sheet-metal-shelf-industrial-sheet-metal-storage-racks/">industrial</a> PLC with a touchscreen HMI for <a href="https://www.herochu.com/product/manual-telescopic-cantilever-rack-manual-cranked-type-cantilever-racking-for-long-materials/">manual</a> intervention, and it exchanges data through WMS or WCS software and an API. Work orders and bundle <a href="https://www.herochu.com/product/steel-plate-storage-master/">master</a> data can be pushed from ERP, while storage status and consumption are pulled back. Herochu maps the interface to the data model the plant already runs, so the warehouse does not end up maintaining a second, private inventory alongside the official one.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="25">What happens when a count goes wrong?</p>
<p data-docx-p-idx="26">Every movement is a commanded move with position feedback, so the controller knows what it asked for and where the gantry actually is. If a slot confirmation disagrees with the command, for example a bundle set down out of position or a manual removal without a transaction, the address is blocked and an exception is raised. That is the <a href="https://www.herochu.com/product/steel-plate-racking-system-sheet-metal-storage-rack-design/">design</a> point worth insisting on: an error surfaces at the slot, not as a wrong figure in a report three weeks later.</p>
<p data-docx-p-idx="27">Table 1. Inventory record structure for a <a href="https://www.herochu.com/tube-bundle-automated-storage-retrieval-solution-for-cnc-laser-tube-cutting-machine/">tube bundle</a> store</p>
<table class="first-row first-col no-vband phoenix-docx-preview-docx_tablegrid">
<colgroup>
<col />
<col />
<col /></colgroup>
<tbody>
<tr>
<td>
<p data-docx-p-idx="28">Data field</p>
</td>
<td>
<p data-docx-p-idx="29">Captured at</p>
</td>
<td>
<p data-docx-p-idx="30">Used for</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="31">Bundle ID</p>
</td>
<td>
<p data-docx-p-idx="32">Receiving station</p>
</td>
<td>
<p data-docx-p-idx="33">Traceability from stock to cut part</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="34">Heat number</p>
</td>
<td>
<p data-docx-p-idx="35">Receiving</p>
</td>
<td>
<p data-docx-p-idx="36">Material certificates and customer requirements</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="37">Tube size and length</p>
</td>
<td>
<p data-docx-p-idx="38">Receiving</p>
</td>
<td>
<p data-docx-p-idx="39">Retrieval planning and <a href="https://www.herochu.com/product/sheet-plate-remnant-rack-for-laser-cutter/">remnant</a> matching</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="40">Bundle weight</p>
</td>
<td>
<p data-docx-p-idx="41">Receiving or weigh station</p>
</td>
<td>
<p data-docx-p-idx="42">Load check before each gantry move</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="43">Slot address</p>
</td>
<td>
<p data-docx-p-idx="44">Storage command</p>
</td>
<td>
<p data-docx-p-idx="45">Retrieval without a search</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="46">Work order reservation</p>
</td>
<td>
<p data-docx-p-idx="47">ERP or MES</p>
</td>
<td>
<p data-docx-p-idx="48">Prevents double allocation</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="49">Remaining length</p>
</td>
<td>
<p data-docx-p-idx="50">Return station</p>
</td>
<td>
<p data-docx-p-idx="51">Remnant reuse and consumption booking</p>
</td>
</tr>
</tbody>
</table>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="52"><a href="https://www.herochu.com/frequently-asked-questions-of-horizontal-panel-racks/">Frequently asked questions</a></p>
<p data-docx-p-idx="53">Can the system hold bundles and <a href="https://www.herochu.com/product/single-and-double-sided-cantilever-racks/">single</a> <a href="https://www.herochu.com/product/automated-long-goods-storage-system-rods-profiles-panels-tubes-pipes/">tubes</a> together? Yes. The tower and cassette <a href="https://www.herochu.com/product/optimize-laser-cutting-workshop-storage-layout/">layout</a> is configured around the material mix on site, so <a href="https://www.herochu.com/long-sheet-metal-storage-rack-design/">long</a> bundles, short lengths and loose pieces can share the same structure, each with the support its shape requires.</p>
<p data-docx-p-idx="54">Does the tube laser need a matching brand of control? No. The handshake is built at the transfer station and through PLC signals or WMS and WCS messages, so one store can feed different <a href="https://www.herochu.com/gantry-robot-fully-automatic-sheet-metal-loading-and-unloading-for-cutting-machines/">cutting machines</a> on the same floor.</p>
<p data-docx-p-idx="55">What happens to the inventory during a power failure? The controller retains the inventory and the last confirmed positions. On restart the gantry returns to its reference position before it accepts new commands, so no move begins from an assumed location.</p>
<p data-docx-p-idx="56">Can towers be added after the first phase? The rail and control architecture can be planned for phased expansion. Herochu fixes the growth allowance at the layout stage, so a later tower does not require rebuilding the control concept.</p>
<p data-docx-p-idx="57">Material discipline at a tube laser either holds at the storage point or fails everywhere downstream. Herochu supplies the towers, the gantry, the controls and the inventory logic as one package, and returns a 2D and 3D workshop layout with a <a href="https://www.herochu.com/horizontal-vs-cantilever-roll-out-racks-choosing-the-right-10000-lb-capacity-system/">capacity</a> calculation within 12 hours of receiving the material list.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
