<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Tube Bundle AS/RS Solution for Tube Laser Cutting Machine &#8211; Sheet Metal &amp; Pipe Storage Racks Manufacturer | Heavy-Duty Cantilever Racking Systems</title>
	<atom:link href="https://www.herochu.com/product-tag/tube-bundle-as-rs-solution-for-tube-laser-cutting-machine/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.herochu.com</link>
	<description>Herochu Machinery</description>
	<lastBuildDate>Sat, 28 Nov 2026 05:34:58 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.5</generator>

<image>
	<url>https://www.herochu.com/wp-content/uploads/2025/09/cropped-0206-32x32.png</url>
	<title>Tube Bundle AS/RS Solution for Tube Laser Cutting Machine &#8211; Sheet Metal &amp; Pipe Storage Racks Manufacturer | Heavy-Duty Cantilever Racking Systems</title>
	<link>https://www.herochu.com</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Tube Bundle AS/RS Solution for Tube Laser Cutting Machine</title>
		<link>https://www.herochu.com/product/tube-bundle-as-rs-solution-for-tube-laser-cutting-machine/</link>
		
		<dc:creator><![CDATA[herochu]]></dc:creator>
		<pubDate>Sat, 28 Nov 2026 05:34:57 +0000</pubDate>
				<guid isPermaLink="false">https://www.herochu.com/?post_type=product&#038;p=14620</guid>

					<description><![CDATA[<p data-docx-p-idx="7">QUICK ANSWER A tube bundle AS/RS stores bundles in vertical towers along a rail and uses a gantry crane to move them between storage and the cutting line. Capacity comes from tower count, level count and load per level, so the layout is sized from the bundle mix rather than from whatever floor happens to be free.Tube storage is usually the last part of a laser cutting project to be planned and the first to become a constraint. The machine is specified to cut 8 m tube at speed, then fed from a floor stack three bundles deep while operators spend the shift moving material. A tube bundle AS/RS closes that gap by treating storage as part of the line, not as a yard at the back of the building.</p>]]></description>
										<content:encoded><![CDATA[<div class="ast-oembed-container " style="height: 100%;"><iframe title="Automatic Pipe Storage System #lasercutting #storagesolutions" width="1200" height="675" src="https://www.youtube.com/embed/fPKAdbLnJe8?feature=oembed" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe></div>
<p data-docx-p-idx="8"><a href="https://www.herochu.com/product/tube-bar-cantilever-rack-bars-and-tubes-storage-systems/">Tube</a> <a href="https://www.herochu.com/smart-organized-storage-for-metal-sheets/">storage</a> is usually the last part of a <a href="https://www.herochu.com/loading-and-unloading-system-for-laser-cutting/">laser cutting</a> project to be planned and the first to become a constraint. The machine is specified to cut 8 m tube at speed, then fed from a floor stack three bundles deep while operators spend the shift moving <a href="https://www.herochu.com/product/pipe-storage-material-warehouse-2/">material</a>. A <a href="https://www.herochu.com/tube-bundle-automated-storage-retrieval-solution-for-cnc-laser-tube-cutting-machine/">tube bundle</a> <a href="https://www.herochu.com/product/automatic-sheet-metal-storage-retrieval-system-as-rs-2/">AS/RS</a> closes that gap by treating storage as part of the line, not as a yard at the back of the building.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="9">What is included in a <a href="https://www.herochu.com/is-a-tube-bundle-as-rs-only-for-new-buildings/">tube bundle AS/RS</a>?</p>
<p data-docx-p-idx="10">Five subsystems have to work as one: the <a href="https://www.herochu.com/optimized-racking-for-4x8-aluminum-sheets-6x20-steel-plates/">racking</a> towers, the rail-mounted <a href="https://www.herochu.com/product/fully-automatic-plate-gantry-loading-and-unloading-robot-manipulator-with-drawer-type-sheet-metal-rack/">gantry</a>, the cassettes, the <a href="https://www.herochu.com/laser-cutting-machine-with-auto-loading-and-unloading-system/">loading and unloading</a> stations, and the WMS or WCS layer that issues commands. <a href="https://www.herochu.com/videoitalian-clients-are-coming-to-herochu-for-a-factory-audit/">Herochu</a> builds all five, which matters at the interfaces, where most lost performance sits between one supplier&#8217;s mechanical scope and another&#8217;s control scope.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="11">How much floor space does <a href="https://www.herochu.com/fully-automated-center-for-laser-sheet-metal-cutting-with-vertical-storage-system/">vertical storage</a> return?</p>
<p data-docx-p-idx="12">A 6 m bundle stacked on the floor occupies its footprint plus the aisle a <a href="https://www.herochu.com/forklift-compatible-sheet-metal-pallet-racking/">forklift</a> needs, and the stack rarely goes more than two or three high before <a href="https://www.herochu.com/automatic-handling-and-unloading-manipulator-economic-efficiency-and-operational-agility/">handling</a> becomes unsafe. A <a href="https://www.herochu.com/herochu-cantilever-racks-single-sided-vs-double-sided-choosing-the-right-storage-solution-for-your-workshop/">double-sided</a> <a href="https://www.herochu.com/product/optimize-laser-cutting-workshop-storage-layout/">layout</a> uses one gantry aisle for two banks of <a href="https://www.herochu.com/cantilever-steel-bar-tubing-pipe-storage-racks/">cantilever</a> arms, so storage grows upward. Herochu quotes up to 80% footprint reduction, and the figure holds when the building has the clear height.</p>
<p data-docx-p-idx="13">Clear height is the first constraint to check. The standard upright is 6000 mm, and the model with eight levels needs more building height than the five-level version, plus space for sprinkler clearance and any overhead crane. A layout that ignores the roof will not survive the first site survey.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="14">Which configuration matches 6 m and 8 m bundles?</p>
<p data-docx-p-idx="15">Three base models cover the common range, and every column in the table is <a href="https://www.herochu.com/customizable-sheet-metal-storage-shelves-space-efficient-sheet-metal-racks/">customizable</a> to the material list. The 6053 model suits 6 m tube at 3000 kg per level, while the 8055 and 8085 models take 8 m tube at 5000 kg per level and differ mainly in level count and tower count.</p>
<p data-docx-p-idx="16">Table 1. Tube bundle AS/RS configurations</p>
<table class="first-row first-col no-vband phoenix-docx-preview-docx_tablegrid">
<colgroup>
<col />
<col />
<col />
<col />
<col /></colgroup>
<tbody>
<tr>
<td>
<p data-docx-p-idx="17">Model</p>
</td>
<td>
<p data-docx-p-idx="18"><a href="https://www.herochu.com/pipe-cantilever-storage-system/">Pipe</a> length</p>
</td>
<td>
<p data-docx-p-idx="19">Levels</p>
</td>
<td>
<p data-docx-p-idx="20">Load per level</p>
</td>
<td>
<p data-docx-p-idx="21">Towers</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="22">HC-XG6053-6</p>
</td>
<td>
<p data-docx-p-idx="23">6000 mm</p>
</td>
<td>
<p data-docx-p-idx="24">5 (<a href="https://www.herochu.com/heavy-duty-customized-vacuum-cantilever-crane-metal-sheet-vacuum-lifters/">customized</a>)</p>
</td>
<td>
<p data-docx-p-idx="25">3000 kg</p>
</td>
<td>
<p data-docx-p-idx="26">6 (customized)</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="27">HC-XG8055-8</p>
</td>
<td>
<p data-docx-p-idx="28">8000 mm</p>
</td>
<td>
<p data-docx-p-idx="29">5 (customized)</p>
</td>
<td>
<p data-docx-p-idx="30">5000 kg</p>
</td>
<td>
<p data-docx-p-idx="31">8 (customized)</p>
</td>
</tr>
<tr>
<td>
<p data-docx-p-idx="32">HC-XG8085-10</p>
</td>
<td>
<p data-docx-p-idx="33">8000 mm</p>
</td>
<td>
<p data-docx-p-idx="34">8 (customized)</p>
</td>
<td>
<p data-docx-p-idx="35">5000 kg</p>
</td>
<td>
<p data-docx-p-idx="36">10 (customized)</p>
</td>
</tr>
</tbody>
</table>
<p data-docx-p-idx="37">Gantry travel 5-30 m/min, <a href="https://www.herochu.com/video%ef%bc%9aautomation-fiber-laser-cutting-machines-lifting-and-handling-systems/">lifting</a> 5-15 m/min, repeatability plus or minus 2 mm. Cantilever arms 800 mm, upright height 6000 mm.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="38">How do you size tower count and levels?</p>
<p data-docx-p-idx="39">Sizing starts from the bundle mix, not from tonnage. The inputs that change the answer are the number of tube sizes held, bundles in and out per day, the shift pattern, the 6 m to 8 m length mix, and how much <a href="https://www.herochu.com/product/sheet-plate-remnant-rack-for-laser-cutter/">remnant</a> stock the plant keeps. A shop cutting one diameter needs fewer addresses than a job shop running forty sizes through the same tower.</p>
<p data-docx-p-idx="40">Tower count and gantry travel trade against each other. More towers <a href="https://www.herochu.com/how-to-store-stainless-steel-plates/">store</a> more bundles, but the gantry covers more <a href="https://www.herochu.com/industrial-high-capacity-rail-telescopic-cantilever-rack-system-solution-for-profile-steel-metal-pipe/">rail</a> per cycle, so hourly throughput can fall unless a second gantry is added. Fewer, taller towers raise density and cut travel, at the cost of a longer lift and a taller building. The answer usually appears when both cases are drawn in one 3D layout.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="41">How does the store connect to the <a href="https://www.herochu.com/product/sheet-material-rack-for-laser-plasma-and-cutting-machines/">laser</a>?</p>
<p data-docx-p-idx="42">The connection is a transfer station, not a conveyor bolted to the machine. The gantry delivers a bundle to the station, the bundle is opened there, and <a href="https://www.herochu.com/product/single-and-double-sided-cantilever-racks/">single</a> <a href="https://www.herochu.com/product/automated-long-goods-storage-system-rods-profiles-panels-tubes-pipes/">tubes</a> move forward to the <a href="https://www.herochu.com/product/laser-loading-unloading-system/">laser loading system</a>. Cutting the bundle open inside the tower is not a <a href="https://www.herochu.com/product/steel-plate-racking-system-sheet-metal-storage-rack-design/">design</a> option, because the tower is a storage structure and not a destrapping area.</p>
<p data-docx-p-idx="43">Sequencing matters as much as hardware. If bundles are issued in the order the schedule needs them, the laser queue and the buffer stay short. If they are issued in the order they sit in the tower, the operator rebuilds the schedule at the machine and the <a href="https://www.herochu.com/video%ef%bc%9aautomation-two-tow-two-loading-and-unloading-two-tower-plate-storage-warehouse/">automation</a> has bought nothing.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="44">What planning inputs does Herochu need?</p>
<p data-docx-p-idx="45">A material list with tube sizes, lengths and bundle weights; a drawing or dimensions of the hall, including column positions and clear height; the cutting schedule for a typical week; and the growth expected over three to five years. Herochu returns a 2D and 3D CAD layout, a <a href="https://www.herochu.com/horizontal-vs-cantilever-roll-out-racks-choosing-the-right-10000-lb-capacity-system/">capacity</a> calculation and a detailed quotation within 12 hours, which is fast enough to test two or three layout options before the building work is <a href="https://www.herochu.com/roll-out-vs-fixed-cantilever-racks-a-cost-benefit-analysis/">fixed</a>.</p>
<p class="phoenix-docx-preview-docx_heading2" data-docx-p-idx="46"><a href="https://www.herochu.com/frequently-asked-questions-of-horizontal-panel-racks/">Frequently asked questions</a></p>
<p data-docx-p-idx="47">Is a tube bundle AS/RS only for new buildings? No. Most projects go into an existing hall. The rail foundation, floor tolerance and clear height are surveyed first, and the layout is adjusted around columns, doors and existing <a href="https://www.herochu.com/product/heavy-duty-sheet-metal-storage-equipment/">equipment</a>.</p>
<p data-docx-p-idx="48">Can one gantry serve two <a href="https://www.herochu.com/gantry-robot-fully-automatic-sheet-metal-loading-and-unloading-for-cutting-machines/">cutting machines</a>? It can, if the throughput calculation covers both machines and the transfer stations keep travel short. The control layer then prioritises by work order rather than first-come order.</p>
<p data-docx-p-idx="49">How is a bundle weight of 5000 kg handled safely? The cassette, arm and tower are engineered for the stated load, and the gantry checks the load record before each move. Loads above the configured limit are refused by the controller rather than attempted.</p>
<p data-docx-p-idx="50">Does the system replace the overhead crane? In most layouts it removes <a href="https://www.herochu.com/product/sheet-metal-vacuum-crane-lifter/">the crane</a> from routine bundle handling. A crane may still be kept for maintenance lifts and for receiving if the infeed station is outside the gantry rails.</p>
<p data-docx-p-idx="51">The value of a tube bundle AS/RS is not the <a href="https://www.herochu.com/industrial-grade-long-piece-storage-equipment-hand-operated-telescopic-cantilever-shelf-for-steel-timber-aluminum-space-saving-heavy-duty-forklift-friendly/">steel</a> in the towers. It is the search, double handling and guesswork removed between a delivery and a cut part. Herochu plans that flow from the rail survey to the work order interface.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
