<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Double Sided Crank-Out Telescopic Cantilever Rack for 6m Steel Pipes and Tubes &#8211; Sheet Metal &amp; Pipe Storage Racks Manufacturer | Heavy-Duty Cantilever Racking Systems</title>
	<atom:link href="https://www.herochu.com/product-tag/double-sided-crank-out-telescopic-cantilever-rack-for-6m-steel-pipes-and-tubes/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.herochu.com</link>
	<description>Herochu Machinery</description>
	<lastBuildDate>Mon, 23 Nov 2026 03:18:33 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.5</generator>

<image>
	<url>https://www.herochu.com/wp-content/uploads/2025/09/cropped-0206-32x32.png</url>
	<title>Double Sided Crank-Out Telescopic Cantilever Rack for 6m Steel Pipes and Tubes &#8211; Sheet Metal &amp; Pipe Storage Racks Manufacturer | Heavy-Duty Cantilever Racking Systems</title>
	<link>https://www.herochu.com</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Double Sided Crank-Out Telescopic Cantilever Rack for 6m Steel Pipes and Tubes</title>
		<link>https://www.herochu.com/product/double-sided-crank-out-telescopic-cantilever-rack-for-6m-steel-pipes-and-tubes/</link>
		
		<dc:creator><![CDATA[herochu]]></dc:creator>
		<pubDate>Mon, 23 Nov 2026 03:18:33 +0000</pubDate>
				<guid isPermaLink="false">https://www.herochu.com/?post_type=product&#038;p=14424</guid>

					<description><![CDATA[<strong><span class="">How do you store 6-meter steel pipe so that an overhead crane can reach every bundle without a forklift entering the rack bay?</span></strong><span class=""> The answer is a double-sided crank-out telescopic cantilever rack. Each level rolls forward on a hand-cranked carriage until the arms extend 100 percent clear of the frame. The crane lifts vertically from open air, not from inside a pocket. Herochu builds this configuration with 36-inch-deep arms, four levels, and a rated capacity of 14,400 lbs per level—enough for full bundles of 6m pipe and tube on both sides of a central column</span><span class="">.</span>]]></description>
										<content:encoded><![CDATA[<div class="ast-oembed-container " style="height: 100%;"><iframe title="Telescopic Cantilever Racks for 6 Meter Steel Tube Bundles  #storagesolutions  #rack #tube #pipe" width="1200" height="675" src="https://www.youtube.com/embed/UfDAnnNj9yk?feature=oembed" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe></div>
<p class="ds-markdown-paragraph"><strong><span class="">How do you <a href="https://www.herochu.com/how-to-store-stainless-steel-plates/">store</a> 6-meter <a href="https://www.herochu.com/product/steel-tubing-storage-racks-metal-pipe-storage-racks/">steel pipe</a> so that an overhead crane can reach every bundle without a <a href="https://www.herochu.com/forklift-compatible-sheet-metal-pallet-racking/">forklift</a> entering the rack bay?</span></strong><span class=""> The answer is a <a href="https://www.herochu.com/single-vs-double-sided-cantilever-racks-a-comprehensive-comparison/">double-sided</a> <a href="https://www.herochu.com/roll-out-honeycomb-rack-for-long-materials-crank-out-cantilever-racks/">crank-out</a> <a href="https://www.herochu.com/high-capacity-telescopic-cantilever-racking-system-for-profile-steel-metal-pipe/">telescopic</a> <a href="https://www.herochu.com/roll-out-cantilever-racks/">cantilever rack</a>. Each level rolls forward on a <a href="https://www.herochu.com/heavy-duty-hand-cranked-crank-out-cantilever-racking/">hand-cranked</a> carriage until the arms extend 100 percent clear of the frame. <a href="https://www.herochu.com/product/sheet-metal-vacuum-crane-lifter/">The crane</a> lifts vertically from open air, not from inside a pocket. <a href="https://www.herochu.com/videoitalian-clients-are-coming-to-herochu-for-a-factory-audit/">Herochu</a> builds this configuration with 36-inch-deep arms, four levels, and a rated <a href="https://www.herochu.com/horizontal-vs-cantilever-roll-out-racks-choosing-the-right-10000-lb-capacity-system/">capacity</a> of 14,400 lbs per level—enough for full bundles of <a href="https://www.herochu.com/roll-out-telescopic-cantilever-pipe-rack-the-best-rack-for-6m-9m-12m-steel-pipe/">6m</a> <a href="https://www.herochu.com/pipe-cantilever-storage-system/">pipe</a> and <a href="https://www.herochu.com/product/tube-bar-cantilever-rack-bars-and-tubes-storage-systems/">tube</a> on both sides of a central column</span><span class="">.</span></p>
<p class="ds-markdown-paragraph"><span class="">The operational problem this solves is not subtle. A static <a href="https://www.herochu.com/cantilever-steel-bar-tubing-pipe-storage-racks/">cantilever</a> rack forces the operator to reach into the structure, pry apart bundles, or send a forklift down a narrow aisle. Every <a href="https://www.herochu.com/product/automatic-profile-material-library-automated-retrieval-for-profile-inventory/">retrieval</a> carries the risk of metal-on-metal contact. With a crank-out <a href="https://www.herochu.com/product/steel-plate-racking-system-sheet-metal-storage-rack-design/">design</a>, the rack becomes a set of <a href="https://www.herochu.com/product/heavy-weight-capacity-cantilever-racking/">heavy</a> <a href="https://www.herochu.com/product/heavy-duty-cantilever-sheet-metal-shelf-industrial-sheet-metal-storage-racks/">industrial</a> <a href="https://www.herochu.com/videodrawer-type-system-for-storage-of-sheet-and-plate-material/">drawers</a>. The operator turns an ergonomically geared crank, the loaded level glides outward, and the entire bundle sits exposed from above. The forklift stays out of the bay. The crane does the <a href="https://www.herochu.com/video%ef%bc%9aautomation-fiber-laser-cutting-machines-lifting-and-handling-systems/">lifting</a></span><span class="">.</span></p>
<p class="ds-markdown-paragraph"><strong><span class="">Is a double-sided <a href="https://www.herochu.com/product/heavy-duty-hand-cranked-crank-out-rack-a-customizable-solution-for-irregular-loads/">crank-out rack</a> actually more space-efficient than two <a href="https://www.herochu.com/herochu-cantilever-racks-single-sided-vs-double-sided-choosing-the-right-storage-solution-for-your-workshop/">single-sided</a> <a href="https://www.herochu.com/maximize-space-access-heavy-duty-roll-out-racks-for-elevator-assembly/">racks</a>?</span></strong><span class=""> Yes, for a straightforward reason: one central upright column serves two <a href="https://www.herochu.com/smart-organized-storage-for-metal-sheets/">storage</a> faces. Herochu’s double-sided frames effectively double storage density per square foot of footprint while preserving direct access to every level</span><span class="">. In a <a href="https://www.herochu.com/product/fabrication-shop-sheet-metal-storage-rack/">fabrication shop</a> where <a href="https://www.herochu.com/vertical-metal-offcut-storage-rack-heavy-duty-floor-space-optimization-and-lean-material-management/">floor space</a> is committed to machining centers, welding stations, or assembly, that density matters. You are not just storing more pipe; you are storing it without widening the aisle or adding a second rack line.</span></p>
<p class="ds-markdown-paragraph"><span class="">The 6m pipe application deserves specific attention. <a href="https://www.herochu.com/long-sheet-metal-storage-rack-design/">Long</a> tube and pipe behave differently from short <a href="https://www.herochu.com/automatic-bar-stock-storage-system/">bar stock</a>. A 6-meter bundle has flex. If the arms are not deep enough, or if the bundle is unsupported across its length, the <a href="https://www.herochu.com/product/pipe-storage-material-warehouse-2/">material</a> sags and the lift becomes unpredictable. Herochu’s 36-inch arm depth and <a href="https://www.herochu.com/modular-sheet-metal-racking-system-sheet-metal-load-unload-system-for-lasers/">modular</a> upright spacing are built for this load <a href="https://www.herochu.com/video%ef%bc%9aprofile-automatic-storage-unit-automatic-pipe-storage-rack/">profile</a>. The top level can also serve as stationary storage, giving the rack a hybrid role: active crank-out levels below, static overflow above. <a href="https://www.herochu.com/product/custom-automated-sheet-metal-storage-systems-manufacturer/">Custom</a> configurations—level count, arm depth, and capacity—are available through Herochu’s engineering team rather than forced through a catalog part number</span><span class="">.</span></p>
<p class="ds-markdown-paragraph"><strong><span class="">What industries use this rack configuration?</span></strong><span class=""> The short answer is any operation that moves <a href="https://www.herochu.com/automated-storage-and-retrieval-system-for-long-goods%ef%bc%8clong-stock-and-sheet-material/">long stock</a> with an overhead crane. Automotive stamping plants store extrusion and tube for bumper and chassis components. Agricultural <a href="https://www.herochu.com/product/heavy-duty-sheet-metal-storage-equipment/">equipment</a> <a href="https://www.herochu.com/cantilever-rack-manufacturers/">manufacturers</a> keep rectangular tube and angle close to the weld cell. <a href="https://www.herochu.com/electrical-panel-lifting-equipment/">Electrical</a> contractors store conduit and strut. Mold and die shops handle guide pins and <a href="https://www.herochu.com/revolutionizing-metal-storage-with-an-automated-long-bar-and-tube-storage-system/">long bar</a>. <a href="https://www.herochu.com/product/vertical-sheet-storage-for-metal-fabrication/">Metal fabrication</a> job shops use the rack as a buffer between the saw and the press brake. The common thread is not the material type; it is the <a href="https://www.herochu.com/automatic-handling-and-unloading-manipulator-economic-efficiency-and-operational-agility/">handling</a> method. If the facility already has a bridge crane or <a href="https://www.herochu.com/product/jib-crane-hoist-electric-chain-suction-cup-vacuum-lifter/">jib crane</a> over the storage area, a <a href="https://www.herochu.com/what-is-a-crank-out-cantilever-rack/">crank-out cantilever rack</a> turns that crane into a faster, safer retrieval tool</span><span class="">.</span></p>
<p class="ds-markdown-paragraph"><span class=""><a href="https://www.herochu.com/maximize-space-safety-a-guide-to-8-ton-single-layer-steel-plate-racks/">Safety</a> and ergonomics often justify the investment before throughput gains do. Reaching into a static rack to hook a bundle is a shoulder-and-back event repeated dozens of times per shift. Extending a crank and lifting vertically with a crane removes the overreach and the awkward pull. Workers do not climb the rack. They do not stand under a suspended bundle while prying it loose. The crank gearing reduces the force required to move a fully loaded level, so the mechanism remains operable by a <a href="https://www.herochu.com/product/single-and-double-sided-cantilever-racks/">single</a> person even at rated capacity</span><span class="">. For operations tracking workers’ compensation costs, that change in body mechanics is measurable.</span></p>
<p class="ds-markdown-paragraph"><span class="">Herochu manufactures crank-out <a href="https://www.herochu.com/maximizing-floor-space-why-a-vertical-sheet-metal-storage-rack-outperforms-cantilever-systems/">cantilever systems</a> in Jinan on standardized production lines, with <a href="https://www.herochu.com/ce-certified-warehouse-pipe-storage-systems-high-capacity-cantilever-racks/">CE</a>, UE, and <a href="https://www.herochu.com/sheet-metal-automatic-storage-unit-ce-ue-iso-9001-certified/">ISO 9001</a> certification available. The double-sided configuration for 6m <a href="https://www.herochu.com/industrial-grade-long-piece-storage-equipment-hand-operated-telescopic-cantilever-shelf-for-steel-timber-aluminum-space-saving-heavy-duty-forklift-friendly/">steel</a> pipe and tube is a core build, not an afterthought. The practical starting question is not whether a crank-out rack fits a <a href="https://www.herochu.com/heavy-duty-warehouse-pipe-storage-cantilever-racking-system/">pipe storage</a> problem, but which level count and arm depth match the crane hook height and the bundle weights actually moving through the bay. Herochu’s approach is to engineer that fit around the load profile rather than selling a <a href="https://www.herochu.com/roll-out-vs-fixed-cantilever-racks-a-cost-benefit-analysis/">fixed</a> unit</span><span class="">.</span></p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
