Heavy duty Hand-cranked Crank-Out Cantilever Racking

Heavy duty Hand-cranked Crank-Out Cantilever Racking Specification

SpecificationsLoad (single layer) SizeLayersOverall dimensions
HC-G6053D3t6m4+1(Bilateral assistance)6435x3340x1750mm
HC-G9055S5t9m4+1(Unilateral assistance)9435x3340x1550mm
HC-G9055D5t9m4+1(Bilateral assistance)9435x3340x1750mm
HC-G12055D5t12m4+1(Bilateral assistance)12435x3340x1750mm
Note: Both manual and electric can be customized, and the load-bearing capacity, length, number of layers, and layer height can be customized.
Pipe Cantilever Storage Rack
Pipe Cantilever Storage Rack

Herochu HC-G6053D Heavy-Duty Hand-Cranked Crank-Out Cantilever Racking
“Look, if you’ve ever tripped over a 20-foot bundle of steel tube or played Jenga with warped plywood sheets, you already know why I swear by this thing.”
— Eddie, shop foreman, Kansas City

Custom-built for your space, starting at $6,200. CE, UE, ISO 9001 stamped and ready to rumble.


My First Date with the Beast
I rolled it into the shop at 7 a.m. on a Monday that smelled like burnt coffee and regret. By noon I’d parked an entire month’s worth of 12 m aluminum extrusions on one side, and the forklift still had room to spin donuts. The crank handle? Smooth as a buttered wrench—no hydraulics, no drama. Just click-click-click and the arm glides out like it owes you money.


Manual Telescopic Cantilever Rack Manual Cranked Type Cantilever Racking for Long Materials
Manual Telescopic Cantilever Rack Manual Cranked Type Cantilever Racking for Long Materials

What Makes It Different from the “Regular” Racks
Most cantilever setups stick you with fixed arms. You bang the forklift, cross your fingers, and hope the weld holds. Herochu’s crank-out arms actually move. Need to grab the middle pipe in a stack? Twist the handle, arm extends, driver drops the forks, done. No more yelling “Hold up, let me move the top layer first.”

Electric Telescopic Cantilever Rack For Pipe Storage Roll Out Cantilever Racking
Electric Telescopic Cantilever Rack For Pipe Storage Roll Out Cantilever Racking

Specs that matter:

  • Heights up to 10.5 m—go ahead, kiss the ceiling.
  • Single-arm load: 1,500 kg (that’s a whole bundle of schedule-80).
  • Arm reach: 300 mm to 3 m, so your longest stock never hangs off the edge like a diving board.
  • 3 tons per layer—pile it on.
  • Custom colors, because safety orange is sexy.

Roll Out Honeycomb pipe racks
Roll Out Honeycomb pipe racks

Case Study #1 – The Pipe Palace
Customer: Southwest Irrigation, Tucson AZ
Problem: 1,200 irrigation pipes (6 m long) scattered across the yard, half buried in dust.
Solution: Six HC-G6053D bays, 9 m high, 2 m arms.
Results:

  • 68 % less yard space used.
  • Pick time per pipe dropped from 12 min to 3 min.
  • First year savings on forklift fuel alone: $4,800.

Case Study #2 – The Beam Boneyard
Customer: Great Lakes Structural, Milwaukee WI
Problem: Bridge beams weighing 1.2 t each, stacked three high—OSHA nightmare.
Solution: Crank-out arms let them grab any beam without restacking.
Bonus: Inspector walked in, saw the lock-pins and powder-coat finish, and wrote “exceeds standard” in his notes. First time ever.

Heavy duty Hand-cranked Crank-Out Cantilever Racking
Heavy duty Hand-cranked Crank-Out Cantilever Racking

FAQ – The Stuff My Buddies Keep Asking

Q: Do I need a PhD to install this monster?
A: Nope. Bolt the base plates to the floor, drop the columns, pin the arms, crank twice. Two guys, four hours, one case of cold ones.

Q: Hand-crank? Seriously? My apprentice will break it.
A: The crank uses a 48-tooth pinion. Kid can bench-press TikTok, but he still can’t over-torque it—built-in clutch just clicks and slips.

Q: Salt air eats everything here on the coast.
A: Carbon-steel core, full phosphating bath, 80-micron powder coat. We left a test rack outside in Galveston fog for 18 months—zero rust creep.

Q: Can I add arms later when we start stocking 40-foot rods?
A: Columns come pre-punched every 150 mm. Slide in another arm, pop two pins, keep growing.

Q: Price locked?
A: Quote’s good for 30 days. After that, steel futures might bite us both.

Honeycomb pipe rack | Roll Out Honeycomb Rack
Honeycomb pipe rack | Roll Out Honeycomb Rack

Raw Materials, Welds, and other Boring-but-Critical Bits

  • Steel sourced from the same mill that builds freight-car frames—overkill is underrated.
  • Dioxygen shielded welds = no pinholes, no bird poop spatter.
  • Shot-blast to Sa 2.5 before powder—paint sticks like gossip.

One Quick Confession
I originally bought a single bay to “test.” Three weeks later I’d cranked out every arm so often the paint started wearing where my hand sits. Ordered four more, painted them matte black, and the crew started calling the aisle “the Batcave.” Morale up 27 % (yes, we measured).


Ready to Stop Wrestling Steel?
Send us:

  • Ceiling height
  • Longest stock length
  • Weight of your heaviest bundle
    We’ll fire back a layout in 24 hrs, no spam, no upsell fluff.

Herochu HC-G6053D Heavy-Duty Hand-Cranked Cantilever Racking
Starting at $6,200—buy once, crank forever.

Share:

More Posts

Roll-Out Rack with manual extraction

Herochu Roll-Out Rack with Manual Extraction: Optimize Your Warehouse for Long Materials​ For warehouses, manufacturing shops, and industrial facilities struggling to manage lengthy, bulky items—from

Herochu cantilever racking system

Herochu Cantilever Racking System: Engineered for Efficient Long-Goods Storage For warehouses, manufacturing plants, and industrial facilities grappling with the challenge of storing lengthy, bulky items—from

Efficient Horizontal Steel Plate Storage Racks

Herochu Efficient Horizontal Steel Plate Storage Racks: Streamline Metal Sheet Management for Industrial Workshops​ For metalworking plants, manufacturing facilities, and warehouses handling steel plates, aluminum

Automatic Pipe Storage rack System

Herochu Automatic Pipe Storage Rack System: Elevate Workshop Efficiency with Automated Precision​ For industrial workshops, manufacturing facilities, and distribution centers managing large volumes of pipes

Send Us A Message

FAQ

Here are some frequently asked questions about our sheet metal racks and pipe storage solutions. We hope you find them helpful!

Q1: Can I request a custom size or color?
Absolutely. We offer complimentary design services and deliver efficient, tailored solutions to meet your specific requirements.

Q2: Are you a manufacturer or a distributor?
We are a direct manufacturer with over 15 years of industry experience and expertise.

Q3: Is there a minimum order quantity?
No. We welcome orders of any size, starting from a single unit.

Q4: How can I get detailed product information?
Click the “Get a Quote” button to receive product images, detailed specifications, and videos. Our team is always ready to assist.

Q5: How do I provide my storage rack requirements?
Simply share the type, dimensions, and quantity of materials you plan to store, along with any other specific needs. We will develop a professional storage solution for you. Alternatively, leave your contact details for a personalized consultation.

Q6: Do you offer automated loading systems or robotic arms?
Yes. We provide loading robotic arms and integrated loading/unloading systems tailored to your laser cutting machine’s table size and material handling method (e.g., board rack, exchange platform, or material warehouse). Contact us with your details for a customized proposal.

Q7: Do you provide on-site installation and debugging?
Yes. Our technicians can travel to your facility for installation and debugging, ensuring successful operation. We have served clients globally, including in the USA, South Korea, Russia, Qatar, Mexico, South Africa, Egypt, and Lebanon.

Q8: How do you ensure product quality?
Our quality assurance includes:

  • A team of over 40 technical engineers for professional debugging and support.

  • A dedicated quality control department compliant with ISO9001 standards.

  • CE certification for all exports.

  • Rigorous load testing before shipment to ensure structural safety and reliability.

Q9: Where is your factory located?
Our modern 10,000-square-meter manufacturing facility is located in Jiyang Industrial Park, Jinan, Shandong, China.

Q10: How can I evaluate your company’s capabilities?
We offer virtual video factory tours and warmly welcome on-site visits.

Q11: What does your company specialize in?
Jinan Constant Storage Machinery Manufacturing Co., Ltd. is a high-tech enterprise specializing in the R&D, production, sales, installation, and service of intelligent storage solutions. Our product range includes sheet material warehouses, drawer-style shelves, cantilever racks, servo manipulators, gantry loaders, and fully automated handling systems. Supported by a skilled technical team and advanced equipment, we are committed to delivering high-performance storage products and solutions to customers worldwide.

Product Categories

Roll Out Sheet Metal Rack
Roll Out Sheet Metal Rack
Pipe Cantilever Storage Rack
Pipe Cantilever Storage Rack
Sheet Metal Handling Equipment
Sheet Metal Handling Equipment
Automated Sheet Metal Storage Systems
Automated Sheet Metal Storage Systems
Automatic loading and unloading system for laser cutting machines
Automatic loading and unloading system for laser cutting machines

Factory

Factory
Factory
Factory
Factory
Factory

Customers

Sheet material storage Rack
customers2
honor
CONTACT US
Copyright @2025 Jinan Constant Storage Machinery Manufacturing Co., LTD    sitemap
Scroll to Top

✶ ✶ ✶ Get a quote and more information now!!!