Herochu Roll-Out Telescopic Cantilever Shelves
Precision Storage for Long, Heavy & Bulky Material – From $3,099, CE / EU / ISO 9001 Certified
When bar stock, angle iron, tube, pipe, rollers or mandrels spend more time on the floor than under load, productivity bleeds away. Herochu Roll-Out Telescopic Cantilever Shelves convert that wasted aisle space into dense, secure, instantly accessible storage. One push of the pendant brings the required material to the operator, eliminates the “dig-out” delay and frees up to 70 % of the footprint normally sacrificed to static racks. Starting at $3,099 every unit is engineered to order, so the rack respects your ceiling height, crane hook path, forklift reach and stock variety—no compromises, no surplus steel.

- Space Reclaimed, Revenue Gained
Traditional cantilever racking demands a permanent 3–4 m service aisle in front of every bay. Herochu’s telescopic arms glide out 100 % on sealed bearings, present the load, then retract, restoring that aisle for the next task. Customers routinely double inventory within the same square metres, deferring expensive extensions or off-site rental. Vertical modules up to 6 000 mm high accept additional levels without dismantling the frame, so growth is handled by bolting on another arm, not another building. - One Rack, Any Length, Any Shape
Arm spacing adjusts on 50 mm increments; arm length from 550 mm to 1 200 mm; single or double-sided configuration. Whether you store 300 mm off-cuts or 12 m seamless tube, each level is repositioned in minutes. Curved dies, extruded sections or timber mouldings that defy conventional pallets are cradled securely—no timber chocks, no banding gymnastics. - Electric Simplicity, Human Speed
A 0.75 kW SEW geared motor drives each arm through a rack-and-pinion train rated for 30 000 cycles between services. The PLC frequency-converter gives smooth, variable speed and automatic slow-down on extension, removing whip on heavy loads. Operators use a wireless pendant or optional foot-switch; no manual heaving, no pinch points. Compared with fork-truck handling, cycle time per pick drops by 48 % on average (customer data, 2023). - Industrial Muscle, Civilised Operation
Arms are cut from Q235B structural steel, 8 mm thick at the root, robot-welded and mag-particle inspected. A single arm accepts 8 t with deflection <1/200 span; whole bays have been tested to 42 t uniformly distributed. The powder-coated finish is baked at 180 °C for 30 min, giving 1 000 h salt-spray resistance—suitable for humid coast or aggressive steel-service centres. Optional extras include arm-end drop pins, impact buffers, aisle photoelectric barriers and deck-mounted crane rails, so even 10 m lengths can be lifted straight from the rack into the CNC bar feeder. - Compliance You Can Quote
Every welded joint is logged against EN ISO 3834-2. Baseplates, bolt sets and anchors meet Eurocode 3; electrical panel carries CE mark and is wired to EN 60204-1. Full documentation—declaration of performance, material mill certificates, load test video, FEM 10.2.06 static analysis—is supplied before despatch. Insurance underwriters and safety officers recognise the file instantly, trimming weeks from factory acceptance.
Standard Models – Ship in 4 Weeks
HC-G6053S – 6 m storage length, 3 t per arm, 8 t total, single side
HC-G6053D – 6 m storage length, 3 t per arm, 25 t total, double side
HC-G9055S – 9 m storage length, 5 t per arm, 35 t total, single side
HC-G9055D – 9 m storage length, 5 t per arm, 42 t total, double side
Custom Program – Engineer-to-Order
HC-B3015-63 through HC-B6020-66 and beyond: choose length up to 12 m, arm profile, loading tier, colour RAL and control logic. We model in SolidWorks, run finite-element checks, then issue approval drawings within 72 h. Typical lead-time is 6–8 weeks door-to-door, including on-site assembly supervision.

Real-World Footprint Examples
• Steel service centre, Rotterdam: replaced 24 static racks with 14 HC-G9055D units, released 480 m² for additional coil storage.
• Aluminium extrusion job-shop, Chicago: cut retrieval time for 6 m bars from 8 min to 90 s, removed one forklift shift per day.
• PVC pipe distributor, Dubai: stored 1 200 t of 110–315 mm pipe in a 12 m high building that previously held 650 t on floor pallets.
Installation & After-Sales
Herochu supplies anchor layouts, epoxy cartridges and laser-set templates so local contractors can complete bolting in one shift. Motors are plug-and-play; control enclosure arrives pre-terminated. A 24 h hotline and regional spare-hub keep critical components on the shelf; SEW motors and Schneider PLCs are available worldwide. Annual inspection contracts include arm deflection check, bearing regrease and software backup, ensuring the ten-year warranty remains valid.
Sustainability Statement
Steel is 30 % recycled content, 100 % recyclable at end-of-life. The powder line captures and re-uses overspray, and all packaging is steel strapping plus recyclable PE film—no single-use timber crates. By doubling density, the rack reduces the need for new warehouse builds and the associated embodied carbon.

Ordering Path
- Send a simple sketch: building width, maximum load per SKU, crane hook height.
- Receive proposal with plan view, load chart and firm price within 48 h.
- Approve drawings; 50 % deposit triggers production; balance on despatch after video acceptance.
- Track shipment on customer portal; schedule commissioning engineer to arrive with the goods.

From $3,099 you buy more than steel—you buy minutes per pick, square metres reclaimed and the certainty that every length of material is exactly where the computer says it is. Specify Herochu Roll-Out Telescopic Cantilever Shelves, issue the PO and watch your long goods finally start working for you instead of against you.
