Heavy Duty Multi-Tower sheet stock Racking System Motorized Drawer Type ASRS
A heavy duty multi-tower sheet stock racking system with motorized drawer type ASRS is selected by load profile, sheet format, and retrieval rhythm. Buying the tallest tower is not the same as buying the right tower. Herochu builds each system around the sheets a fabricator actually stores, then adds the PLC control, motorized tray movement, and inventory software that make the storage usable.
Heavy Duty Multi-Tower sheet stock Racking System Motorized Drawer Type ASRS
A heavy duty multi-tower sheet stock racking system with motorized drawer type ASRS is selected by load profile, sheet format, and retrieval rhythm. Buying the tallest tower is not the same as buying the right tower. Herochu builds each system around the sheets a fabricator actually stores, then adds the PLC control, motorized tray movement, and inventory software that make the storage usable.
What is a motorized drawer type ASRS for sheet stock?
It is an automated storage and retrieval system in which sheet trays or drawers are moved by motorized mechanisms inside a multi-tower structure. The operator calls a tray from a PLC touchscreen, and the system presents it at the access opening. The “drawer” action is the controlled extraction of the tray; the “ASRS” is the automated storage and retrieval logic behind it.
Herochu’s system combines vertical tower storage with a material cart for precision picking. The sheet stays flat and supported during movement. The operator does not climb a rack, reach into a deep cantilever, or guide a forklift into a narrow aisle.
What load and size specifications matter most?
The starting point is the sheet footprint and the weight per level. Herochu’s heavy-duty range covers:
-
HC-S3015-2-63: 3,000 × 1,500 mm, 2 towers, 6 layers, 3,000 kg per level
-
HC-S4015-3-85: 4,000 × 1,500 mm, 3 towers, 8 layers, 5,000 kg per level
-
HC-S4020-4-105: 4,000 × 2,000 mm, 4 towers, 10 layers, 5,000 kg per level
-
HC-S6020-4-125: 6,000 × 2,000 mm, 4 towers, 12 layers, 5,000 kg per level
Clear space is 240 mm as standard and can be customized. Transfer speed is 5–15 m/min. Repeat positioning accuracy is ±2 mm. These figures should be checked against the heaviest bundle, the thickest plate, and the largest sheet the shop expects to quote—not only the material it cuts today.
How do you choose between 2, 3, and 4 towers?
Choose by SKU mix and retrieval frequency. A shop with a narrow range of gauges and one dominant sheet size can often run a compact two-tower layout. A shop with multiple materials, thicknesses, and batch requirements usually needs more tower capacity to keep classifications separate. A four-tower system suits high-volume, multi-type storage where the goal is a centralized dispatch hub rather than a single storage point.
Layer count follows the same logic. Six layers may be enough for a low-mix operation. Ten or twelve layers make sense when the shop wants to store more material without expanding the footprint. Herochu customizes both tower count and layer count, so the system can match the ceiling height and the material plan.
What does “heavy duty” mean in daily operation?
It means the structure, trays, and drive system are built for long-term use with robust construction. It also means the system can handle the repeated load cycles of a production environment, not just the static load of a warehouse. A sheet metal tower may retrieve material dozens of times per shift. The tray, the lift, and the access opening all see regular use.
Herochu’s design uses PLC touchscreen control for one-touch delivery. The material cart supports precision picking. The system is built as an integrated storage and retrieval solution, so the mechanical parts and the control logic are matched. That matters for uptime. A tower that jams because the tray and cart were specified separately is not heavy duty, even if the steel is thick.
How does a heavy-duty ASRS improve safety and floor use?
It removes the forklift from the storage aisle. It removes the need for an operator to reach into a rack. It removes the manual alignment step that causes sheet damage and hand injuries. The operator interacts with the system at a controlled access point, and the motorized drawer presents the material at a working height.
Floor use improves because the storage goes vertical. A multi-tower layout stores hundreds of tons of sheet in a compact footprint. The space that was once a floor stack becomes production space, staging space, or a safer walkway. For a shop paying rent or considering an expansion, that recovered floor area is often the fastest return on the project.
How should a fabricator calculate ROI?
Start with three numbers: retrieval time, floor space cost, and material damage. If a manual pick takes six minutes with two people and an automated pick takes under a minute with one person, the labor difference is measurable. If the tower recovers floor space that would otherwise require a building expansion, the avoided cost is measurable. If the system prevents one scrapped sheet per week because the wrong gauge was loaded, the material savings are measurable.
Herochu’s system also supports real-time inventory and ERP integration, which reduces the cost of stocktaking and overstock. Those savings are slower to see than labor, but they compound. A shop that knows what it has does not buy material it already owns.
FAQ: Heavy duty multi-tower sheet stock racking system motorized drawer type ASRS
Q: Is a motorized drawer type ASRS suitable for thick plate?
A: Yes, provided the load per level and clear space are specified correctly. Herochu offers 3,000 kg and 5,000 kg per level depending on model, with customizable clear space.
Q: Can the system store multiple materials in one tower?
A: Yes. The WMS classifies material by size, thickness, batch, or other attributes. Multi-tower layouts allow further separation by material type or SKU group.
Q: How fast is retrieval?
A: Transfer speed is 5–15 m/min, with ±2 mm repeat positioning accuracy. Actual cycle time depends on tower height, tray location, and access point layout.
Q: Does Herochu provide customization after the model is selected?
A: Herochu customizes tower count, layer count, sheet dimensions, and clear space at order. The model range is a starting point, not a fixed catalogue limit.
FAQ
Here are some frequently asked questions about our sheet metal racks and pipe storage solutions. We hope you find them helpful!
Q1: Can I request a custom size or color?
Absolutely. We offer complimentary design services and deliver efficient, tailored solutions to meet your specific requirements.
Q2: Are you a manufacturer or a distributor?
We are a direct manufacturer with over 15 years of industry experience and expertise.
Q3: Is there a minimum order quantity?
No. We welcome orders of any size, starting from a single unit.
Q4: How can I get detailed product information?
Click the “Get a Quote” button to receive product images, detailed specifications, and videos. Our team is always ready to assist.
Q5: How do I provide my storage rack requirements?
Simply share the type, dimensions, and quantity of materials you plan to store, along with any other specific needs. We will develop a professional storage solution for you. Alternatively, leave your contact details for a personalized consultation.
Q6: Do you offer automated loading systems or robotic arms?
Yes. We provide loading robotic arms and integrated loading/unloading systems tailored to your laser cutting machine’s table size and material handling method (e.g., board rack, exchange platform, or material warehouse). Contact us with your details for a customized proposal.
Q7: Do you provide on-site installation and debugging?
Yes. Our technicians can travel to your facility for installation and debugging, ensuring successful operation. We have served clients globally, including in the USA, South Korea, Russia, Qatar, Mexico, South Africa, Egypt, and Lebanon.
Q8: How do you ensure product quality?
Our quality assurance includes:
A team of over 40 technical engineers for professional debugging and support.
A dedicated quality control department compliant with ISO9001 standards.
CE certification for all exports.
Rigorous load testing before shipment to ensure structural safety and reliability.
Q9: Where is your factory located?
Our modern 10,000-square-meter manufacturing facility is located in Jiyang Industrial Park, Jinan, Shandong, China.
Q10: How can I evaluate your company’s capabilities?
We offer virtual video factory tours and warmly welcome on-site visits.
Q11: What does your company specialize in?
Jinan Constant Storage Machinery Manufacturing Co., Ltd. is a high-tech enterprise specializing in the R&D, production, sales, installation, and service of intelligent storage solutions. Our product range includes sheet material warehouses, drawer-style shelves, cantilever racks, servo manipulators, gantry loaders, and fully automated handling systems. Supported by a skilled technical team and advanced equipment, we are committed to delivering high-performance storage products and solutions to customers worldwide.
Customer visit
Herochu has always been adhering to the market-centric approach to meet customer requirements to the maximum extent, and the business philosophy of “creating brands with heart and gaining reputation with sincerity”. It provides customers with high-quality products and services with rigorous military quality, professionalism, and excellence, and has won unanimous praise in the Chinese aerospace, Chinese weapons, Chinese railways, automobile manufacturing, engineering machinery, non-ferrous metal titanium alloy and other industries.
Factory
Hot Selling Machines
-
Multi-tower intelligent board material warehouse
Multi-Tower Sheet Metal Storage & Retrieval System for CNC Workshop Fabrication
Read moreRated 0 out of 5 -
Multi-tower intelligent board material warehouse
Heavy Duty Multi-Tower sheet stock Racking System Motorized Drawer Type ASRS
Read moreRated 0 out of 5 -
Multi-tower intelligent board material warehouse
Customizable Automated Multi-Tower sheet-material WMS warehouse
Read moreRated 0 out of 5 -
Multi-tower intelligent board material warehouse
Intelligent Multi-Tower Sheet Metal Storage System with Loading Robot
Read moreRated 0 out of 5 -
Heavy Duty Steel Bar Storage Racks
Aluminium Bar Storage Rack 6.5m for Laser Cutting Machines
Read moreRated 0 out of 5 -
Steel Pipe Warehouse Storage Rack
Crank-Out Steel Pipe Storage Rack 6m – Heavy Duty Double Sided Cantilever Racking
Read moreRated 0 out of 5 -
Heavy Duty Cantilever Racking Systems
Manual Single and Double Sided Cantilever Rack for 6m Stainless Steel Tubes
Read moreRated 0 out of 5 -
Hand Cranked Pipe Rack
Double Sided Crank-Out Telescopic Cantilever Rack for 6m Steel Pipes and Tubes
Read moreRated 0 out of 5
Related products
-
Sheet Storage Rack
Roll out vertical sheet metal rack | Vertical Pipe and Sheet Metal Storage
Read moreRated 0 out of 5 -
Sheet Metal Forklift Racks
Custom Forklift Storage Racks Manufacturer Prices
Read moreRated 0 out of 5 -
Fabrication shop sheet metal storage racks
Fabrication shop sheet metal storage rack
Read moreRated 0 out of 5
















